3PE 2PE Fbe Buried Steel Gas/Water Pipelines Coating Production Line

China 3PE 2PE Fbe Buried Steel Gas/Water Pipelines Coating Production Line, Find details about China 3PE Coating, 3-Layer Anticorrosion Coating from 3PE 2PE Fbe Buried Steel Gas/Water Pipelines Coating Production Line

Model NO.
3PE1200-3000
Trademark
HSD
Transport Package
Plastic Film and Wooden Pallet
Specification
1220-3000mm
Origin
Qingdao, China
HS Code
8477209000
Model NO.
3PE1200-3000
Trademark
HSD
Transport Package
Plastic Film and Wooden Pallet
Specification
1220-3000mm
Origin
Qingdao, China
HS Code
8477209000

3PE 2PE FBE Buried Steel  gas/Water Pipelines Coating Production Line

Description
Steel pipe anti-corrosion coating production line is used for making 3LPE, 2LPE, FBE anti-corrosion coating on steel pipe with a diameter from 32mm to 1220mm, which is widely used in varieties of engineering construction, especially in the heating, gas, oil field.
 

3PE 2PE Fbe Buried Steel Gas/Water Pipelines Coating Production Line

3 layer PE anti-corrosion coating consists of first FBE coating, middle adhesive layer and outer polyethylene layer.

The three-layer polyethylene anti-corrosion coating is advanced technology as the outer protective layer of buried pipe, widely used in the anti-corrosion of gas and oil transmission pipeline, urban gas supply, water supply pipe and other fluid transmission pipelines. 3 layer PE anti corrosion coating can strengthen the pipeline's mechanical properties with high electrical resistance, waterproof, wearable and anti-aging performance.
3PE 2PE Fbe Buried Steel Gas/Water Pipelines Coating Production Line




The anti-corrosion coating processing line includes:
-steel pipe transmission system
-surface treatment system
-pipe dust removal system
-pipe heating system
-electrostatic spraying system
-coating system
-water cooling system
-end cutting system
-hydraulic and pneumatic system
-testing system
-electronic control system.


Technological processes
Upload pipespipes screw conveyorrust removal of intermediate frequency heatingEpoxy powder coatingouter layer soli quid & polyethylene coatingcooling spraypipes screw conveyorgrinding pipes, sendunload pipes

3PE 2PE Fbe Buried Steel Gas/Water Pipelines Coating Production Line


Main Equipment List

No.NameSet
A. Derusting Equipment                                          
1Pipe-conveying Equipment 1
2Shot Blast Cleaning Machine1
3Cyclone Dust Collector1
4Pulse dust collector1
5Centrifugal exhaust fan 1
6Rust removal equipment PLC1
B. Coating equipment
1Coating transfer equipment1
2IF heating device1
3Powder spraying device1
4 Automatic loading dryer2
5SJ-65/30 Extruder 1
6SJ-180/30 Extruder1
7Hot melt adhesive extruder die1
8PE sheet extruder head mold1
9Hot melt adhesive/PE sheet coating device1
10Environmental Protection Ventilation equipment1
11Cooling Spray equipment1
C.Platform Equipment
1Steel pipe platform1
2Post-rust removal transition platform1
3Product tube storage platform1
4Hydraulic Equipment3
D.Groove Equipment
1PE Beveling Machine2
2Hydraulic Lifting and Turning Machinery1
3Hydraulic Equipment1
4PLC1
E.Compressed air Equipment
1Screw Air Compressor1
2Cold dry machine1
3Precision filters3
4Gas tanks1

3PE 2PE Fbe Buried Steel Gas/Water Pipelines Coating Production Line
3PE 2PE Fbe Buried Steel Gas/Water Pipelines Coating Production Line

Factory outside
3PE 2PE Fbe Buried Steel Gas/Water Pipelines Coating Production Line


Our team
3PE 2PE Fbe Buried Steel Gas/Water Pipelines Coating Production Line


Workshop

3PE 2PE Fbe Buried Steel Gas/Water Pipelines Coating Production Line
3PE 2PE Fbe Buried Steel Gas/Water Pipelines Coating Production Line

Customer visiting
3PE 2PE Fbe Buried Steel Gas/Water Pipelines Coating Production Line


Delivery
3PE 2PE Fbe Buried Steel Gas/Water Pipelines Coating Production Line


Exhibition
3PE 2PE Fbe Buried Steel Gas/Water Pipelines Coating Production Line

Company Information

Qingdao Huashida Machinery Co., LTD, located in Qingdao City, Shandong Province, is specialized in manufacturing kinds of plastic pipe machines, municipal pipe machines and steel pipe insulation machines.
Our main products:
1. HDPE jacket pipe for pre-insulated pipe Production Line
2. Pre-insulated pipe Production Line
3. Flexible pre-insulated pipe(PERT) production line
4. Steel pipe FBE/2LPE/3LPE anti-corrosion coating line
5. Steel pipe derusting line
6. PE pressure pipe/Water Gas supply pipe production line
6. PP/PE plastic board/sheet/geomembrane production line
7. NBR PVC thermal insulation tube/plate production line  
8.Pipeline anti-corrosion materials and instruments: heat shrink joint coating sleeve, electro-fusion weldable joint sleeve, portable welding gun(extruder), PE PP welding rod.  

 
Our Service:
We have about 18 years of experience in this field. With ISO CE certification and rich experience, Huashida will be your reliable supplier for plastic machines.  We warmly welcome friends from all over the world to visit our factory. 
1. We could send engineers to the buyer's factory for installation instruction, commissioning and training service at buyer's cost.
2. Our machine has 12-month guarantee (for electrical parts 6 months) since the installation in the buyer's factory. During the guarantee time, if any parts (except the easy damaging parts) are damaged under normal operation, we will offer free spare parts. After the guarantee time, we will offer the spare parts with a cost price.
3. If the buyer has any problem during the operation, we will offer prompt technical solutions.
 
With more than 15 years of experience and focus on plastic machines, Huashida will be your good choice. 

 
    Hot Tags: 3PE-Steel-Pipe-Anti-Corrosion-Production-Line 3Layer-PE-Steel-Pipe-Coating-Line 3PE-Steel-Pipe-Anticorrosive-Making-Line 3Layer-PE-Steel-Pipe-Anti-Corrosion-Processing-Line 3Layer-PE-Steel-pipe-production-Line 3PE-Coating-Line