Ladle Refining Furnace

China Ladle Refining Furnace, Find details about China Lf Furnace, Arc Furnace from Ladle Refining Furnace

Model NO.
LF
Manufacturing Level
E
Media
Organic Heat Transfer Material
Burning Style
Electric
Pressure
Low Pressure
Trademark
semc
Transport Package
Plywood and Steel Frame
Specification
60ton
Origin
China
HS Code
8454201090
Model NO.
LF
Manufacturing Level
E
Media
Organic Heat Transfer Material
Burning Style
Electric
Pressure
Low Pressure
Trademark
semc
Transport Package
Plywood and Steel Frame
Specification
60ton
Origin
China
HS Code
8454201090
Deeply appreciate your enquiry, We are biggest of chinese government company 30 years experiences,1000 workers with 10 billion USD turnover in shanghai china .Welcome your visiting or
60ton LF Specification
     
  1.  
LF   Block of LF furnace 1 
  1.  
To deal with every steel water heatert6070 max
  1.  
LFLF furnace transformer rated capacityMVA1.220% overload
  1.  
Primary VoltageKV35 
  1.  
Secondary VoltageV270-250-1706 No-loading adjust voltage 6 grade .
  1.  
Secondary CurrentA27700 
  1.  
Heating rateºC/min:4.0Max:6.0
  1.  
Electrode diametermmF400UHP
  1.  
Average refining cyclemin35 
  1.  
Electrode moving distancemm2500 
  1.  
Electrode moving speedM/min3--4 
  1.  
Refining ladle car load T150 
  1.  
Refining ladle car speedM/min12()
 (Siemens)
  1.  
Furnace hearth diametermmФ2500(60t)
60ton molten steel surface
  1.  
Ladle upper diametermmФ3000 
  1.  
Ladle heightmm3700 
  1.  
Free space heightmm450(60t)60ton molten steel surface
  1.  
Cooling water inlet temperatureºC≤34 
  1.  
Temperature RiseºC≤15 
  1.  
Cooling water flowM3/h200 
  1.  
Water pressureMPa≥0.35 
  1.  
Power SupplyV35000High voltage
380-220Low voltage
FrequencyHz50 
  1.  
Argon
()
 
Mpa≥0.8 
L/min300Counsumption
%99.99Pure rate
  1.  
Compressed airMpa≥0.4/ No water no oil
 
 
  1. 60LF
60ton consumption:
          
1Smelting timemin/≤35 
2Electrode consumption

Kg/t

≤0.3 
3Power consumptionKwh/t≤50 
4Heating rateºC/min:4.0Max:6.0
5The life of Water-cooled furnace cover ≥5000 
8Ladle campaign life  ≥55 
 
 
  1. 60LF:
60Ton LF scope list
                   
  1.  
Refining furnace transformer 112MVA/35KV 
  1.  
Oil and water cooler 1  
  1.  
Energy-efficient water-cooled Busbar 1  
  1.  
Copper composite electrode arm 1  
  1.  
Water-cooled cable 1  
  1.  
Electrode column hoisting mechanism 1  
  1.  
Bridge 1  
  1.  
Tubular water-cooled heat pack cover 1  
  1.  
Package hoisting mechanism 1  
  1.  
60T 60T Refining Ladle 2  
  1.  
150T 150T Refining Ladle car 2  
  1.  
Car-dragging line agencies 1  
  1.  
Hydraulic System 1  
  1.  
Water cooling system 1  
  1.  
Argon convergence
distribution systems
 1  
  1.  
High-voltage supply system 1  
  1.  
Low-voltage automatic control system 1  
  1.  
Intelligent electrode regulator 1  
  1.  
, Power and control cables, tray 1  
  1.  
PC and configuration software 1  
  1.  
Alloy feeding system 1  
  1.  
  1  
  1.  
Wire feeding machine 2  

LF-20t Ladle refining furnace main technical parameters, complete set range and quotation

1.1 Applications
LF-series ladle refining furnace is used for refining of the molten metal in conjunction with the primary melting furnace, such as arc furnace, converter or induction furnace. It possesses the various metallurgical functions of arc heating, argon blow stirring, temperature measuring and sampling and alloying, etc. It is a critical secondary steelmaking facility for high-quality carbon steel, alloy steel, bearing steel, tool steel and stainless steel, and so it could meet the requirements of continuous casting, rolling and ingot production.

1.2 This ladle refining furnace is applicable to the following operating conditions:
1.2.1 Altitude shall not 2, 000m;
1.2.2 Ambient temperature: 0C ~ 40C
1.2.3 Relative humidity shall not exceed 90% (25C);
1.2.4 Free of conductive dust, explosive gas and corrosive gas around the furnace;
1.2.5 No evident vibration or bumps;

1.3 Main technical parameters
No. Description Unite Parameter
1 Ladle Rated capacity t 20
Furnace bath diameter mm φ 1470
Height of free space mm 500
2 Ladle car Travel speed m/min 2-20
Driving type machinery
3 Electrode lifting device Diameter of electrode mm Φ 250
Diameter of electrode distribution circle mm Φ 460
Max, electrode travel mm 1800
Electrode up and down speed m/min 4/3
Rise in temperature speed of melting steel C/min ≥ 3.5
4 Furnace cover Furnace cover lifting height mm 300
5 Hydraulic system Working pressure MPa 12
Working media Water-glycol
6 High current system Impedance mΩ ≤ 2...5
3-phase out-of-balance coefficient % ≤ 5
7 Argon Working pressure MPa 0.2~0.8
Amount NL/min 20~150
8 Cooling water system Working pressure MPa 0.3
Inlet water temperature C ≤ 35
Backwater temperature C ≤ 55
Amount of used water m3/h 120
9 Transformer Rater capacity KVA 3600
Primary voltage kV 35
Secondary voltage V 200-135
Secondary current A 10393
Cooling type OFWF
11 Power supply system High voltage kV 35
Low voltage V AC380
AC220
DC24
2\LF-20t Ladle refining furnace quotation
No. Description QTY(set)
1 Ladle car 1
2 Ladle(without hanger, sliding gate) 1
3 Heating bridge frame and guide device 1
4 Water cooling cover(without lining) 1
5 Electrode lifting device(include conductive arm) 1
6 High current line system(include water cooling cable) 1
7 Cooling water system 1
8 Furnace cover lifting device 1
9 Argon system 1
10 Hydraulic system 1
11 High voltage switch cabinet(35KV) 1
12 PLC automation control system and low voltage control cabinet 1
13 Transformer 3600KVA/35KV 1
Total: FOB Shanghai

3. Self-provide parts by customer
3.1 Electrode and its connector;
3.2 Ladle hanger and sliding gate;
3.3 Refractory material and making lining;
3.4 Hydraulic system working media (water-glycol)\water\compressed air and argon.
3.5 Civil engineering, and the track of ladle car\pre-lay unit and screw of equipment's foundation;
3.6 The connecting pipes and lines for hydraulic oil\cooling water\argon and electric;
3.7 To import high voltage power supply to the input terminal of high voltage switch cabinet and furnace transformer by cable or copper plate, to buy\lay and test the connecting cable (copper plate), it will be borne by the buyer.
3.8 To import low voltage power supply to the input terminal of low voltage control cabinet, and ensure that its phase rotation and ground protection are correct, as well as the connecting lines that between the control cabinets and from the output terminal of control cabinet to the connection point of the equipment, it will be borne by the buyer.

4. Installing and debugging