Building Mateirals Construction Aluminum Formwork

China Building Mateirals Construction Aluminum Formwork, Find details about China Aluminum Formwork, Formwork System from Building Mateirals Construction Aluminum Formwork

Model NO.
3c-2
OEM/ODM
Accepted
Training
Yes
Packaging
Aluminum Formwork Be Packaged Pallet or Nude
Delivery
Usually 25 Work Days or According Your Order Qua
Trademark
LOOG
Specification
CE, ISO, SGS
Origin
China
Model NO.
3c-2
OEM/ODM
Accepted
Training
Yes
Packaging
Aluminum Formwork Be Packaged Pallet or Nude
Delivery
Usually 25 Work Days or According Your Order Qua
Trademark
LOOG
Specification
CE, ISO, SGS
Origin
China

Aluminum Formwork / Aluminum Formwork/concrete reinforcement formwork For Concrete Specifications
Aluminium Formwork
1.Cycle used over 300 times
2.Easy operation
3.Light weight high strength
4.Environmental friendly


Aluminum Formwork / Aluminum Formwork For Concrete
1. Aluminum Formwork

Material

6061-T6 Aluminum alloy

Main Components

Beam, Column, Wall, Prop, Others

Applications

Residential building

Exhibition setup

All the towers can be connected together for multi-purpose

Safe working load

≥60KN/m2   

Features

Easy to Handle

One-time Pouring

High Concrete Pouring Rate

More Reuses

100% Recyclable

Environmental Friendly

 
2.Aluminum formwork advantage
1). Construction cycle is short, high efficiency: Aluminum formwork for the fast form removal system, 
generally 18~36 hours to form removal, so only one layer of aluminum formwork plus three single 
support can be used, a layer of the normal construction of up to 3~4 days, thus greatly shorten the 
construction period, the construction units to save administrative costs, as well as real estate developers 
to shorten the development cycle.
2). Reusable low cost: Regulate the construction of a template can be flipped 300 times or more, use 
of low cost
3). Easy construction, high efficiency: Aluminum formwork assembly is simple, convenient installation, 
simply pro rata increase the standard board, light weight aluminum formwork per square meter 22~25KG. 
Construction process is completely assembled by hand, transshipment; does not depend lifting equipment
4). Good stability, high capacity: capacity up to 60KN per square meter.
5). Wide range of applications:  Aluminum formwork is suitable for all building components, such as 
load~bearing walls, columns, beams, stairs, balconies, etc. are available through the cement pouring at 
once.
Aluminum Formwork VS  Timber Formwork

NO.

Reference

Aluminum Formwork

Timber Formwork

1

Material cost (Included Support)

$183-216/m2

$13--16/m2

2

Repeated used

300times at least

3-5times

3

Safe working load

≥60KN/m2

about 30KN/m2

4

Assembling and dismantling labor cost

$3.6-4.2/m2

$4.2-4.7/m2

5

Recovery value

$67/m2

$0.8/m2

6

Subtotal artificial materials

$4.4-4.9/m2

$7.5-8/m2

7

Leveling the wall plastering labor cost

$0.4/m2

$2/m2

8

Leveling the wall 
plastering material cost

$0.3/m2

$2.6/m2

9

Ergonomics

20m2/day

15m2/day

10

Final economic indicators

$5.9-6.4/m2

$12-13/m2

Remarks:
1. It will be different ,due to its different price of commodities and cost of labor in the locality.
2. Aluminum formwork contains all supporting, waling, release agent etc which must be used under 
construction
 
3. Aluminum Formwork General Specification

Aluminum Formwork

Material

Aluminum alloy 6061-T6

Panel thickness

4mm

Rocker

50mm

Wall panel

600(W) X 2300/2450(H)                   
500(W) X 2300/2450(H)                   
450(W) X 2300/2450(H)                    
400(W) X 2300/2450(H)                  
300(W) X 2300/2450(H)

Deck panel

600(W) X 1200(H)                        
450(W) X 1200(H)

Deck beam

150(W) X 900/1050 (H)

Formwork weight

18-22kg/m2

Carrying capacity

60kn/m2

We can also manufacture upon your requested design with different sizes.Aluminum Formwork / Aluminum Formwork/concrete reinforcement formwork For Concrete.