China Gas Burner Paint Spray Booth with Heat Recovery System, Find details about China Spray Booth, Paint Booth from Gas Burner Paint Spray Booth with Heat Recovery System
Inside Dimension | 8000×5000×3000 mm(L×W×H) | Outside Dimension | 8100x6350x3700mm(LxWxH) |
Front Door | 4000×2800 mm(W×H), metal sheet panel door, bolt inside, strong hinge, sealing strip, 5mm glass 4 folds color: white, blue, red, orange | ||
Service Door | 750×2000mm(W×H), 1 unit with 2 sets pressure lock , 5mm glass | ||
Basement | 300mm high, 5 rows of grilles | ||
Under grilles has differnt models flow equalizing plate , in the middle is the standard flow equalizing plate , All around are customized flow equalizer plates | |||
Wall Panel | 50mm thick EPS, 950mm wide, density is 14kgs/m2. The panel with double sides 0.4mm steels, Tongue and groove interlock structure. | ||
Ceiling Panel | 50mm thick EPS, 950mm wide, density is 14kgs/m2. The panel with double sides 0.4mm steels, Tongue and groove interlock structure. | ||
Ceiling system | Two cotton frames near the air inlet use punching technology to reduce air volume | ||
Intake&Exhaust System | 1x7.5kw turbo fan for air intaking, air capacity is 28000 -30000m3/h; 1x7.5kw turbo fan for exhausting, air capacity is 28000 -30000 m3/h; The frame is soldered by 50mmx50mm square tube and with powder coating. Standard 3m air duct . | ||
Lighting System | Ceiling Lights: 8units×4pcs=32pcs×16W LED lights Side Lights: 10units×2pcs=20pcs×16W LED lights Illumination≥1000Lux. | ||
Heating System | Italy Riello FS20 gas burner, 200000Kcal/h. Stainless steel heat exchanger, max temperature: 80ºC. The burner need the Natural gas as resource to heat air and then the hot air go throught heat exchanger to the room. (Please note that we only provide the burner and its accessories. Customers need to complete the connection between the burner and the gas pipeline with the help of local electrical engineers.) | ||
Heat recovery system | Add a box between the air inlet and air exhaust ducts. There are two kinds of pipes in the box that lead to the inlet fan and the exhaust fan. When the hot air exhaust , it will though the box and will heat the pipe which connected the air inlet fan , and the temperature of the air entering the air inlet box is increased, thereby achieving the effect of heat recovery and utilization . | ||
Purification System | Pre-filter: on the air inlet to prevent large dust and other impurities; Ceiling filter: on the ceiling frame to prevent much smaller dust, make sure the air is clean Fiberglass floor filter: under grilles. To prevent paint mist go outside Activated carbon filter: on air outlet. To absorb paint smell 4 kinds of flters to protect workers and environment. We also put activated carbon particle to help absorbing paint smell. | ||
Controlling System | without inverter type : spray&baking switch, time setting, lighting switch, temperature controller, power supply switch, emergency stop, breakdown alarm, etc. All electrical parts are from SCHNEIDER. | ||
with inverter type : spray&baking switch, time setting, lighting switch, temperature controller, power supply switch, emergency stop, breakdown alarm,etc. All electrical parts are from SCHNEIDER. | |||
Total Power | 16 KW |
Delivery time : after received you payment ,we will produce , for this standard model , the delivery time is 2-3 weeks . |
Payment term: 50% TT IN ADVANCE , 50 % before delivery |
After sales service : 2 years warranty for most parts (Consumables (eg filters) are not included) |
when your workers unloading the goods, If they find something damaged during transit by sea, please take the pictures of the damage in the container and we will reissue you or give you some compensation. (Please note: The picture shows the damaged picture of the goods in the container, which is convenient for us to record) |