China Natural Gas Burner Paint Oven Spray Paint Booth/Paint Cabinet, Find details about China Spray Booth, Paint Booth from Natural Gas Burner Paint Oven Spray Paint Booth/Paint Cabinet
Model NO.: CP-070603 (EZ-YB 100F) | |||
Inside Dimension | 7600×6100×3300 mm(L×W×H) | Outside Dimension | 7700x7650x3700mm(LxWxH) |
Front Door | 4000×3000 mm(W×H), metal sheet panel door, bolt inside, strong hinge, sealing strip, 5mm glass . 4 folds color: white, blue, red, orange | ||
Service Door | 700×2000mm(W×H), 1 unit with 2 sets pressure lock | ||
Basement | No basement , air exhausting from wall panel | ||
Wall Panel | 50mm thick EPS, 950mm wide, density is 14kgs/m2. The panel with double sides 0.4mm steels, Tongue and groove interlock structure. | ||
Ceiling Panel | 50mm thick EPS, 950mm wide, density is 14kgs/m2. The panel with double sides 0.4mm steels, Tongue and groove interlock structure. | ||
Ceiling system | Two cotton frames near the air inlet use punching technology to reduce air volume | ||
Intake&Exhaust System | 1x7.5kw turbo fan for air intaking, air capacity is 28000 -30000m3/h; 1x7.5kw turbo fan for exhausting, air capacity is 28000 -30000 m3/h; The frame is soldered by 50mmx50mm square tube and with powder coating. Standard 3m air duct . | ||
Lighting System | Ceiling Lights: 8units×4pcs=36pcs×16W LED lights Side Lights: 10units×2pcs=20pcs×16W LED lights Illumination≥1000Lux. | ||
Heating System | Italy Riello RG5S diesel burner, 260000Kcal/h. Stainless steel heat exchanger, max temperature: 80ºC. The burner need the diesel as resource to heat air and then the hot air go throught heat exchanger to the room. | ||
Purification System | Pre-filter: on the air inlet to prevent large dust and other impurities; Ceiling filter: on the ceiling frame to prevent much smaller dust, make sure the air is clean. Fiberglass floor filter: from wall panel . To prevent paint mist go outside. Activated carbon filter: on air outlet. To absorb paint smell 4 kinds of flters to protect workers and environment. We also put activated carbon particle to help absorbing paint smell. | ||
Controlling System | spray&baking switch, time setting, lighting switch, temperature controller, power supply switch, emergency stop, breakdown alarm, Differential pressure gauge ,etc. All electrical parts are from SCHNEIDER. | ||
Total Power | 18 KW |
Delivery time : after received you payment ,we will produce , for this standard model , the delivery time is 2-3 weeks . |
Payment term: 50% TT IN ADVANCE , 50 % before delivery |
After sales service : 2 years warranty for most parts (Consumables (eg filters) are not included) |
when your workers unloading the goods, If they find something damaged during transit by sea, please take the pictures of the damage in the container and we will reissue you or give you some compensation. (Please note: The picture shows the damaged picture of the goods in the container, which is convenient for us to record) |