Professional Gold Mining Machine Gold Mining Ball Mill Grinding Ball Mill for Grinding Copper

China Professional Gold Mining Machine Gold Mining Ball Mill Grinding Ball Mill for Grinding Copper, Find details about China Laboratory Ball Mill Machine, Ball Mill from Professional Gold Mining Machine Gold Mining Ball Mill Grinding Ball Mill for Grinding Copper

Model NO.
GM0930
Condition
New
Product Name
Ball Mill Gold
Usage
Grinding All Kinds of Minerals
Model
GM2745
Capacity
17.5-135 T/H
Power
475 Kw
Liners Materials
High Manganese Steel
Feeding Size
25mm
Loading Steel Balls
40 Tons
Ball Mill Weight
90420 Kg
Trademark
Jiangxi Hengchang
Transport Package
by FCL
Specification
11175*5610*4500 mm
Origin
China
HS Code
8474202000
Model NO.
GM0930
Condition
New
Product Name
Ball Mill Gold
Usage
Grinding All Kinds of Minerals
Model
GM2745
Capacity
17.5-135 T/H
Power
475 Kw
Liners Materials
High Manganese Steel
Feeding Size
25mm
Loading Steel Balls
40 Tons
Ball Mill Weight
90420 Kg
Trademark
Jiangxi Hengchang
Transport Package
by FCL
Specification
11175*5610*4500 mm
Origin
China
HS Code
8474202000
Professional Gold Mining Machine Gold Mining Ball Mill Grinding Ball Mill for Grinding Copper Professional Gold Mining Machine Gold Mining Ball Mill Grinding Ball Mill for Grinding Copper

1.Ball Mill Introduction:
Ball mill is a key equipment to grind the crushed materials, and the ball mill is widely used in powder-making production line including cement, silicate, new-type building material, refractory material, fertilizer, ore dressing of ferrous metal and non-ferrous metal, glass ceramics, etc. And the ball mill can grind various ores and other materials with dry type and wet type. There are two kinds of ball mill, grid type and overflow type due to different ways of discharging material.
Professional Gold Mining Machine Gold Mining Ball Mill Grinding Ball Mill for Grinding Copper
Professional Gold Mining Machine Gold Mining Ball Mill Grinding Ball Mill for Grinding Copper
Professional Gold Mining Machine Gold Mining Ball Mill Grinding Ball Mill for Grinding Copper

2.Working Principle of Ball Mill:
Ball mill is a horizontal rotating device transmitted by the outer gear. The materials are transferred to the grinding chamber through the quill shaft uniformly. There are ladder liner and ripple liner and different specifications of steel balls in the chamber. The centrifugal force caused by rotation of barrel brings the steel balls to a certain height and impact and grind the materials. The ground materials are discharged through the discharging board thus the grinding process is finished.
Professional Gold Mining Machine Gold Mining Ball Mill Grinding Ball Mill for Grinding Copper

3.Ball Mill Structure:
Professional Gold Mining Machine Gold Mining Ball Mill Grinding Ball Mill for Grinding Copper

4.Technical Parameter of Ball Mill:
ModelCylinder diameter
(mm)
Cylinder length
(mm)
Max. ball load
(t)
Feeding size
(mm)
Capacity
(t/h)
Motor power
(kw)
Dimension
(LxWxH)mm
Weight
(kg)
GM071875018000.8200.4-1.17.54043×1450×12004350
GM091290012001.1200.3-0.9113843×1850×14004210
GM091890018001.5200.5-1.3154443×1850×14006078
GM092190021001.8200.6-1.518.54743×1850×14006660
GM093090030002.7200.9-2.3225943×1850×14007770
GM1224120024004251.6-4.1305540×2300×185010020
GM1230120030005.3252.2-5.5376340×2300×185011230
GM1245120045007.3253.0-7.5557540×2300×185013210
GM1524150024007252.8-6.5556830×2930×206015430
GM1530150030009253.5-8.0757430×2930×206016843
GM15451500450013.5255.5-13.5908930×2930×206020000
GM15571500570017257-15.511010130×2930×206023597
GM18301830300013253.0-17.01309525×3960×225029490
GM18451830450019255.2-26.015510925×3960×225034210
GM18641830640027258.0-40.021012925×3960×225042440
GM21302100300020254.0-30.01808475×4060×340041965
GM21452100450025255.6-42.02809975×4060×340049230
GM24302400300026.5256.5-822809225×5005×397063684
GM24452400450032.5258-10038010570×5005×397072284
GM273027003000342515-11542010575×5610×450088400
GM274527004500402517.5-13547511175×5610×450090420
GM323032003000442550-9050011000×7200×5700124000
GM3245320045006525100-14563013000×7200×5700145000

5.Ball Mill Applications:
Ball mill is mainly used to grind materials in mineral, cement, refractory, chemical industry, etc. Ball mill has dry and wet ways. When wet ball mill works, certain water and other liquid will be added into materials to increase flow ability of materials, so the capacity is increased. When dry ball mill works, capacity is affected because material flow ability is reduced, so absorbing wind device is needed on the outlet of ball mill, and then negative pressure is formed in the ball mill to increase flow ability of material, so the capacity is increased etc.

6.Sucessful Case:
Professional Gold Mining Machine Gold Mining Ball Mill Grinding Ball Mill for Grinding Copper

7.Packing & Delivery:
Professional Gold Mining Machine Gold Mining Ball Mill Grinding Ball Mill for Grinding Copper

8.About Jiangxi Hengchang:
Jiangxi Hengchang Mining Machinery Manufacturing Co., Ltd.  is located in No.3 Chuangye Road, Guzhang Industrial Park, Shicheng County, Ganzhou City, Jiangxi Province, China.

Our company is engaged in the mineral processing equipment research, development, design and production for many years history, has accumulated rich experience in design and production. Enterprise in mineral processing equipment industry has had a positive effect, set up the good reputation. And mainly the manufacture of the products like as Shaking table, Flotation equipment, Crushing equipment, Magnetic separator, Screening equipment, Classifying equipment, Agitation tank, Feeding equipment, Gravity separation equipment, Wet separation equipment, Spiral chute, Saw-tooth wave jig and Diaphragm Jig, Grinding equipment, Ball mill, Slurry pump, Centrifugal pump, Conveying equipment.

We manufacture various types of mineral processing machinery and equipment according to our customers' requirements. Our products are widely used for sorting gold, silver, copper, iron, tungsten, lead, zinc, tin, molybdenum, nickel, tantalum, niobium, manganese ore, coal, monazite, rutile, diamonds, other precious metals and precious metals mine, and for the flotation colored, black metal, precious metals and other minerals. And we have export qualifications, our products sell well all over the world for several years, especially exported to Brazil, India, Indonesia,South Africa, Somalia, Philippines, Malaysia, Sudan, Nigeria, Iran, Russia, Ghana, Kazakhstan, Kyrgyzstan, Cambodia, Vietnam, Korea, Mongolia, Myanmar and other countries.
Professional Gold Mining Machine Gold Mining Ball Mill Grinding Ball Mill for Grinding Copper
Professional Gold Mining Machine Gold Mining Ball Mill Grinding Ball Mill for Grinding Copper
Professional Gold Mining Machine Gold Mining Ball Mill Grinding Ball Mill for Grinding Copper

FAQ
1. How long has Hengchang been in business?
Our business has been in operation since 1995. For over 20 years we have served the mining industry offering gold/coltan/tin/tungsten mining equipment

2. How long is the warranty period ?
The warranty for the main machine is 12 month. we also supply spare parts to customer.

3. What is the Salary of engineer ?
100 USD Per day, the air ticket, accommodation, should be beared by customer.

4. Where is Hengchang factory located ?
how about the transportation ? The factory is located in Ganzhou city. The Airport is
Huangjin Airport, which can directly flight to Guangzhou, Shanghai, Shenzhen, Beijing.

5. What is the leading time ?
For shaking table and laboratory mining equipment ,we can send out within 10 days;
For large mining equipment and customized machine, the lead time is 30-40 days.

6. What is the nearest Sea port ?
Xiamen Port, Guangzhou Port, Shenzhen Port

7. What is the trade terms ?
CIF,FOB ect is acceptable.

8. What normal mining procedures including?
A. Sampling and analysis of the sample. take enough sample from different location and depth, analysis the size distribution and
element.
B. Engineer and geologist site survey. based on the analysis report at stage one, the geologist will determine the reserve and mining area. the engineer will consider the plant location and process flow.
C. Separation test. take samples to do separation test based on the process flow on stage Two.
D. Based on the result of testing, adjust the process flow if necessary.
E. Determine the capacity of the plant based on the quotation of plant and estimated output.
F. Place order and equipment production.
G. Plant design. ground clearance and basement building according to the design.
H. Plant installation and testing production.
I. Training and debugging.

9. What Information should customers give to us ?
In order to let we provide you with efficient & suitable quotation and assistance.

1). What type is the mining? Is it rock stone? or it is sand?
2). If rock stone,What is the general particle size(mm) of the raw ore?
3). What is the handling capacity(tons per hour) you plan to work with?
4).What is the elements of the raw ore? How much percent of each minerals?