China Factory Supply Scaffolding Steel Pipe for Tent in Stock, Find details about China Pipe for Tent, Steel Pipes from China Factory Supply Scaffolding Steel Pipe for Tent in Stock
Products Details | |||||
Commodity | China factory supply scaffolding steel pipe for tent in stock | ||||
Outer diameter | ERW / HFW | LSAW / DSAW | SSAW / HSAW | RHS | SHS |
1/8 - 20 inch (10.3 - 508 mm) | 12 - 56 inch (323.8 - 1,420 mm) | 8 - 126 inch (219.1 - 3,200 mm) | 40 x 20 mm - 1,000 x 800 mm | 15 x 15 mm - 1,000 × 1,000 mm | |
Wall thickness | 0.4 - 16 mm | 6.0 - 40 mm | 6.0 - 26 mm | 1.0 - 30 mm | 0.6 - 30 mm |
Length | 5.8 ~ 12.0 m or upon customers' requirements | ||||
Standard | GB/T 3091, GB/T 13793, ASTM A252, ASTM A53, ASTM A500, EN 10210, EN 10219, API 5L, DIN 1626/1615, DIN 17120, etc. | ||||
Grade | SS400, Q235, Q345, Q460, A572 Gr.50, Gr.1/Gr.2/Gr.3, S235, S275, S355, Grade A/B, X42, X52,X60, X70, etc. | ||||
Surface | Prime quality (bared, oiled, color paint, 3LPE, or other anti-corrosive treatment) | ||||
Inspection | With Chemical Composition and Mechanical Properties Analysis; Dimensional and Visual Inspection, also with Nondestructive Inspection. | ||||
Application | structure, electric power transmission tower projects, piling, water, oil & gas pipeline engineering, mechanical industry, municipal projects, roads and its auxiliary facilities, etc. | ||||
Packing | Standard export, in bulk / bundles / nylon fabric bags with seaworthy packing; or according to customers' requestments. | ||||
Delivery Time | 1. 20-45 days after received deposit or confirmed L/C 2. Depends on your oder quantity | ||||
Payment Terms | 1. T/T: 30% T/T advance, 70% balance copy of B/L 2. L/C: at sight 3. T/T and L/C: 30% T/T advance, 70% L/C | ||||
Port | China main port |