Garage wave plate roll forming machine
Flow Chart
Profile 1:
Proflie 2:
Material: 1.0mm Minimum Thickness, 2.3mm Maximum Thickness
Galvanized Coil.Machine Componentsa.5 Ton X 600 Hydraulic Un-coiler
Hydraulic system expand coil inner hole, Pump motor: 3KW
Frequency Inverter to regulate turning speed, Motor: 3KW
Link-connect expanding system
Load capacity = Max.5Tons
Coil Inner-diameter= 470-560mm, Coil width = Max.600mm
Automatic stopping device with limited switch as assistance to control stop/star rotation
b.Pre-Leveling Device
Pre-Level Device with 4 over 3 shafts to remove the Coil-set
Cold Rolling Mills
Feeding section with guide;
Gear/Sprocket driving; 23 stages to form
Wall-plate frame design
c.Rollers manufactured from GCr15, Heat Treatment, black finish.
Shafts Diameter=ф95mm, Precision Machined
Main motor =30KW, with air conditioner cooling system.
Protection Mesh Cover (full mesh type) Above Roll-former To Avoid Hands Go Inside, slip type
Below photo for reference only:
d.Lubricating Device 1 set
Hydraulic Cutting
Fly cutting, Slug Breaker;
Cutting tool material : Cr12, Heat treatment;
Hydraulic group, Pump motor =7.5KW
PLC Control System
Control the quantity & cutting length automatically
Combined with: PLC, Touch Screen (Siemens), Inverter (Schneider), Encoder (Omron), etc
Cut-to-length tolerance≤±2 mm
Control Voltage 24V
After-Sale Service
In correct operation & maintaining, the machine is guaranteed for one year since leaving our factory excludes the electric elements.
Installation:
If installation is needed, WE will dispatch a technician to the buyer's factory abroad to assist regulating the machine with charge free.
The buyer should assist US to get the Chinese technician's visa and should pay for the roundtrip air ticket and the local accommodation.
If installation is needed, the buyer shall make the following preparation before arrival of technicians.
Terms Of Trade
Package & Shipment: Facility water-proof packing, Control cabinet packed in wooden packing.
Payment: 30%payment by T/T is required as deposit within a week since the contract signing date.70% payment by T/T is required before the machine be send out of factory.