China 230kv 69kv 161kv 151kv 110kv 33kv Auto Power Transformer / Power Distribution Transformer/Auto Transformer 320000kVA, Find details about China Auto Transformer, Transformer from 230kv 69kv 161kv 151kv 110kv 33kv Auto Power Transformer / Power Distribution Transformer/Auto Transformer 320000kVA
Cooling method | |||||
Winding | Connection | OLTC Position | Voltage | ||
(kV) | Current A | ||||
(ONAN) | Current A | ||||
(ONAF) | |||||
HV | Star | 1 | 207 | 529.9 | 892.5 |
9 | 230 | 176.9 | 803.3 | ||
17 | 253 | 433.6 | 730.2 | ||
LV | auto | 9 | 132 | 831 | 1400 |
Tertiary | Delta | 9 | 20 | 685.5 | 1155 |
7. Vector Group YN a0 d11 | |||||
8. Impedance Voltage in Percent at 75 | |||||
Power MVA | winding | Rated voltage kV | Impedance voltage % | ||
320 | HV/LV | 230/132 | 18 | ||
9. No-load Current: 0.2%: | |||||
10. Sustained Short Circuit Current. | |||||
Winding | Max. Sustained Short-circuit Current. Ka | ||||
HV | 8.5 | ||||
LV | 10.4 | ||||
TV | 19 | ||||
11. Max. Duration of Short-circuits in Seconds(s) | |||||
HV: 3s | |||||
LV: 3 s | |||||
TV: 3s |
1. | Pre sale service |
a. | make technical solution |
b. | send quotation, technical data sheet and drawing |
c. | prepare power transmission plan, testing plan and shipment plan |
2. | In sale service |
a. | supervise the manufacturing schedule totally in accordance with the plan |
b. | send photos to customer during every manufacturing process(hold point) |
c. | inform the customer one week before testing. |
3. | After sale service |
a. | installation and commissioning, training the workers |
b. | quick response within 12 hours any time |
c. | provide 12 months guarantee period normally. |