China Auto Spare Part Exhaust Valve Guide Engine Parts 11126-16010 1112616010 for 4A 3s 3vz, Find details about China 11126-16020, Auto Parts from Auto Spare Part Exhaust Valve Guide Engine Parts 11126-16010 1112616010 for 4A 3s 3vz
BMW | |||||||
Diameter | Height | Pust No. | OEM NO. | Diameter | Height | Pust No. | OEM NO. |
12 | 39.2 | AFS-TG27 | 1146061 | 16 | 48.5 | AFS-TG39 | 11331433672 |
57109521 | 11331721698 | ||||||
7701062312 | 11331734402 | ||||||
9464396380 | 11331714604 | ||||||
22231-2A000 | 11331247054 | ||||||
2S6Q6500AA | 1247054 | ||||||
0942.42/0942.53 | 1712010 | ||||||
Diameter | Height | Pust No. | OEM NO. | Diameter | Height | Pust No. | OEM NO. |
35 | 26 | AFS-TG68 | 1649127 | 33 | 24 | AFS-TG72 | 1748880 6110500225 11321748880 11321748884 OK95K-12-101A |
9186568 | |||||||
1639187 | |||||||
74109309 | |||||||
034109309 | |||||||
86HF6500AA | |||||||
034109309AD | |||||||
Man | |||||||
Diameter | Height | Pust No. | OEM NO. | ||||
32 20 | 76 | AFS-TG157 | 4030541901 | ||||
403050425 | |||||||
4030541101 | |||||||
4030542001 | |||||||
4220500325 | |||||||
4030541001 | |||||||
1030500325 |
Company Profile
Shijiazhuang Jiukai Engine Valve Manufacture Co., Ltd. Is the production of internal-combustion engine exhaust port specialized factory.
The company has a high-quality workforce,has many years engaged in the valve in the development, design, production, service experience.
The company has advanced, well-equipped, with dual metal friction welding, plasma surfacing and other kinds of processing equipment, test equipment, cone, polishing and fixed-end quenching, stem plating,nitrogen, laser surface treatment of advanced production technology.
Company introduction PAL CNC machines for automation,Especially in the valve in surface treatment, use Germany QPQ salt bath tufftriding process, make its surface intensity, abrasion resistance increases greatly strengthened and prolong the service life.
Execution standard: QC/T469-2002.Company tenet: people oriented, quality win.
My company dedicated service, welcome from all walks of life to your inquiries to negotiate the business.
Exhibition
1. When is the delivery time?
Delivery will occur between 15 and 20 days from order date. Faster delivery time can be arranged if needed.
2. Do you have any MOQ limit?
Yes it depends on the products' size and production process.
3. What's your payment method?
Paypal, T/T, L/C, Western Unions, are available.