China Pre Engineering Hotel Factory Two Story Prefabricated Steel Structure Building, Find details about China Steel Structure, Building Material from Pre Engineering Hotel Factory Two Story Prefabricated Steel Structure Building
components | Base | Cement and steel foundation bolts |
Main frame | H beam | |
Material | Q235B, Q345B or others as buyers' requests. | |
Purlin | C or Z purlin | |
Bracing | X-type or other type bracing made from angle, round pipe | |
Bolt | Plain bolt and High-strenth bolt | |
Roof & wall | Sandwich panel with EPS,PU,Rockwool etc.or color steel sheet | |
Door | Sliding or rolling door | |
Window | Aluminium alloy window | |
Surface | Two lays of Anti-rust Painting or Hot Dip Galvanized | |
Sheet | 0.5mm or 0.6mm galvanized sheet | |
Accessories | Semi-transparent skylight belts, Ventilators, down pipe, Glavanized gutter, etc | |
Usages | 1. workshop, warehouse, plant 2. Steel web frame structure 3. Steel H-column and steel H-beam 4. Portal frame products 5. High rise building project 6. Others steel structure buildings | |
Packing | Main steel frame without packing load in 40' OT, roof and wall panel load in 40' HQ! | |
Drawing: | According to drawings or according to customer ' s requirement. | |
Design Parameters | If you need we design for you, please supply us the following parameter together with detail size: 1) length, width, height, eave height, roof pitch, etc 2) wind load, snow load, raining condition, aseismatic requirements, etc 4) Demands for doors and windows 5)Other information if necessary |