Pre Engineering Hotel Factory Two Story Prefabricated Steel Structure Building

China Pre Engineering Hotel Factory Two Story Prefabricated Steel Structure Building, Find details about China Steel Structure, Building Material from Pre Engineering Hotel Factory Two Story Prefabricated Steel Structure Building

Model NO.
wiskind
Type of Steel For Building Structure
H-Section Steel
Carbon Structural Steel
Q235
Residential Wall Structure
Wall Support
Application
Steel Workshop, Steel Structure Platform, Steel Fabricated House, Structural Roofing, Frame Part, Steel Walkway and Floor
Certificate
ISO,BV,SGS
Grade
Q345,Q235
Service
Design,Engineering,Erection
Design Code
Wind Load, Snow Load and Earthquake
Wall and Roof Materials
EPS/PU/Rock Wool Sandwich Panel or Sheet
Purlin
C/Z Shape Steel Channel
Delivery Time
Whithin 20 Days
Advantage
Easy Install, Anti-Earthquake,Storm-Proof
Bolt
10.9 Grade High Strength Bolt
Drawing
According to Customer′s Requirement
Material
Q345b Steel , H Column
Surface Treatment
Coated or Galvanized
Transport Package
Export Standard Packing
Specification
high strength, light weight
Origin
Shandong
HS Code
9406
Model NO.
wiskind
Type of Steel For Building Structure
H-Section Steel
Carbon Structural Steel
Q235
Residential Wall Structure
Wall Support
Application
Steel Workshop, Steel Structure Platform, Steel Fabricated House, Structural Roofing, Frame Part, Steel Walkway and Floor
Certificate
ISO,BV,SGS
Grade
Q345,Q235
Service
Design,Engineering,Erection
Design Code
Wind Load, Snow Load and Earthquake
Wall and Roof Materials
EPS/PU/Rock Wool Sandwich Panel or Sheet
Purlin
C/Z Shape Steel Channel
Delivery Time
Whithin 20 Days
Advantage
Easy Install, Anti-Earthquake,Storm-Proof
Bolt
10.9 Grade High Strength Bolt
Drawing
According to Customer′s Requirement
Material
Q345b Steel , H Column
Surface Treatment
Coated or Galvanized
Transport Package
Export Standard Packing
Specification
high strength, light weight
Origin
Shandong
HS Code
9406
Advantage:
1.small in member section and good in steel degree,high in usable floor area and space rate of utilization,especially applicable to low-rise big-span building.
2.Short in construction period and plot area of construction.
3.Mutiple in disassembly and assembly and used repeatedly with the rate of recovery up to 70%.
4.Strong in corrosion resistance,good in durance and high in reliability,appliable to plant building and storehouse.
5.Good in heat insulation and sound insulation.
6.The roofing and wall face made of light sandwich or color tamped plate,good in integration,strong in wind resistance and earthquake resistance and looking light and generous 


Steel structure progressPre Engineering Hotel Factory Two Story Prefabricated Steel Structure Building
components
 
Base
 
Cement and steel foundation bolts
 
Main frame
 
H beam
 
Material
 
Q235B, Q345B or others as buyers' requests.
 
Purlin
 
C or  Z purlin
 
Bracing
 
X-type or other type bracing made from angle, round pipe
 
Bolt
 
Plain bolt and High-strenth bolt
 
Roof & wall
 
Sandwich panel with EPS,PU,Rockwool etc.or color steel sheet
 
Door
 
Sliding or rolling door
 
Window
 
Aluminium alloy window
 
Surface
 
Two lays of Anti-rust Painting or Hot Dip Galvanized
 
Sheet
 
0.5mm or 0.6mm galvanized sheet
 
Accessories
 
Semi-transparent skylight belts, Ventilators,
down pipe, Glavanized gutter, etc
 
Usages
 
1. workshop, warehouse, plant
2. Steel web frame structure
3. Steel H-column and steel H-beam
4. Portal frame products
5. High rise building project
6. Others steel structure buildings
 
Packing
 
Main steel frame without packing load in 40' OT,
roof and wall panel load in 40' HQ!
 
Drawing:
 
According to drawings or according to customer ' s requirement.
 
 
Design Parameters
 
If you need we design for you, please supply us the following parameter
together with detail size:
1) length, width, height, eave height, roof pitch, etc
2) wind load, snow load, raining condition, aseismatic requirements, etc
4) Demands for doors and windows
5)Other information if necessary
 

Our workshop
Pre Engineering Hotel Factory Two Story Prefabricated Steel Structure Building
Our progress
Pre Engineering Hotel Factory Two Story Prefabricated Steel Structure Building
Our customers
Pre Engineering Hotel Factory Two Story Prefabricated Steel Structure Building
Pre Engineering Hotel Factory Two Story Prefabricated Steel Structure Building

FAQ
1. Do you provide on-site installation service?
 General projects, we can provide Installation guide service based on customers' request.

2.What's your delivery time? 
 Normally, delivery time is 35days after receiving deposit. Large order delivery time should be arranged separately.
3.How to control the quality of your product?
a. quality of the design: think about possible problems in advance and provide a high-quality design solution.
b. quality of the raw material: choose the qualified raw material
c. quality of the production: precise manufacturing technique, experienced workers, strict quality inspection.
4. How to deal with quality problems?
Warranty is 3 years. Within the warranty period, PTH will responsible for all quality problems caused by production.

5. What designs do you have in different climates (How can the products adopt to different climates)?
Strong wind region:   improve the wind-resisting ability of the internal structure.
Cold region: increase the thickness of the wall, or use good insulation material, improve the anti-pressure ability of the structure.
High corrosion region: use corrosion resistant material, or paint anticorrosive coating.


Welcome to visit our company!
Pre Engineering Hotel Factory Two Story Prefabricated Steel Structure Building