Cheap Prefab Warehouse Steel Structure Construction Warehouse Material

China Cheap Prefab Warehouse Steel Structure Construction Warehouse Material, Find details about China Steel Structure Warehouse, Cheap Warehouse from Cheap Prefab Warehouse Steel Structure Construction Warehouse Material

Model NO.
Warehouse-10
Size
8800 Square Meter +1123 Square Meter
Construction Time
2 Month
Engineer Guide
Yes
Process
Communication -Design-Quote-Order -Production-Ship
Usually Surface Treatment
Painting or Galvanised
Usually Steel Structure Color
Painting : MID-Grey, Red, Orange, Blue, White.
Roof and Wall Panel Could Be Choosed
Steel Sheet/EPS, Glass Wool, PU Sandwich Panel
Design
Overall Plan for You
Trademark
Xinmao
Transport Package
Steel Structure Packaged with Pallet
Specification
10000 square meter include two building
Origin
Qingdao
HS Code
9406900090
Model NO.
Warehouse-10
Size
8800 Square Meter +1123 Square Meter
Construction Time
2 Month
Engineer Guide
Yes
Process
Communication -Design-Quote-Order -Production-Ship
Usually Surface Treatment
Painting or Galvanised
Usually Steel Structure Color
Painting : MID-Grey, Red, Orange, Blue, White.
Roof and Wall Panel Could Be Choosed
Steel Sheet/EPS, Glass Wool, PU Sandwich Panel
Design
Overall Plan for You
Trademark
Xinmao
Transport Package
Steel Structure Packaged with Pallet
Specification
10000 square meter include two building
Origin
Qingdao
HS Code
9406900090
Cheap Prefab Warehouse Steel Structure Construction Warehouse Material
--------------------------------------------------------------------------------------------------
Cheap Prefab Warehouse Steel Structure Construction Warehouse Material

 

PROJECT INTRODUCE                                                                                                                          
Bigger one :Painting workshop
 
Cheap Prefab Warehouse Steel Structure Construction Warehouse Material
Cheap Prefab Warehouse Steel Structure Construction Warehouse Material

Small one :Canteen
Cheap Prefab Warehouse Steel Structure Construction Warehouse Material
Cheap Prefab Warehouse Steel Structure Construction Warehouse Material

PACKAGE & DELIVERY                                                                                                                     
Steel structure
All the steel columns and beams will be packed and sticked to the steel pallets to load into the shipping container, which will also save the energy and cost of unloading at the site.
Weight.
around 20 tons per 40'HQ shipping container
Wall&Roof sandwich panels
With films on two sides to protect the sanwich panels from the crashing during the loading and transportation. 


SERVICE                                                                                                                                                
 

Pre-Sales Service.                                                                                  After-Sales Service.

* Inquiry and consulting support.                                                          * Training how to instal the building, training                                                                                                                                                                                                                      how to maintenance the building. 


* Sample testing support.                                                                     * Engineers available to service installation                                                                                                                                                                                                                       overseas.

* View our Factory.

ABOUT US                                                                                                                                                 

Qingdao Xinmao ZT Steel Construction Co., Ltd.

Since:2003
Staff: 486 people, 40 engineers, 12 designers, 25 professional engineering and technical personnel.
Area : More than 50000 sqm .

Product Capacity :5000 TON per month 

Service : We offer design, product, installation one-stop service,we also can send our experienced engineers to your country to guide constructi

FAQ                                                                                                                                                                
Q1.How about your payment term?
A: Both TT and L/C will be accepted. 30% deposit before producing and 70% balance before loading by TT will be more preferred

Q2. How about your delivery time?
A: It depends on order quantities. Noramlly, the delivery time will be 45 days after getting the deposit. 

Q3. How to make the packing?
A: The steel frames will be packed by pallets first, then loading them into the shipping container, which will be easy to unload at the site and save the cost for you. All the ends will be packed by the blankets or bubble plastic films. 
The sandwich panels will also be packed first. 

Q4. Can you provide the installation help?
A: Yes. We can provide you all the drawing by Tekla model, then you can check each part vividly at the site. The installation drawing will also be provided. For some special parts, we can send you the vedio installation guidance. If for some difficult part, we can send our engineers there for installation guidance. If you need, the workers can also be help there. But the cost for them, including the turn-round airplane tickets, accommodation cost at the site, etc. will be born by you there. 


CONTACT                                                                                                                                                
Penny xu 
Project manager 
Mobile:+86-13625426367
Qingdao Xinmao ZT Steel Construction Co., Ltd


OTHER PROJECT                                                                                                                     
Cheap Prefab Warehouse Steel Structure Construction Warehouse Material