Auto Engine Plastic Part Injection Mould

China Auto Engine Plastic Part Injection Mould, Find details about China Plastic Injection Moulding, Mould from Auto Engine Plastic Part Injection Mould

Model NO.
RTIM-2008008
Runner
Cold Runner
Design Software
UG
Installation
Fixed
Certification
ISO
Standard
MISUMI
Customized
Non-Customized
Resin
ABS
Cavity
1X2
Lead Time
20-30 Days
Injection Machine Size
200 Tons
Trademark
Root
Transport Package
Wooden Box
Specification
CE/SGS/RoSH
Origin
Qingdao Shandong
HS Code
8480710090
Model NO.
RTIM-2008008
Runner
Cold Runner
Design Software
UG
Installation
Fixed
Certification
ISO
Standard
MISUMI
Customized
Non-Customized
Resin
ABS
Cavity
1X2
Lead Time
20-30 Days
Injection Machine Size
200 Tons
Trademark
Root
Transport Package
Wooden Box
Specification
CE/SGS/RoSH
Origin
Qingdao Shandong
HS Code
8480710090
Auto Engine Plastic Part Injection MouldAuto Engine Plastic Part Injection Mould
Auto Engine Plastic Part Injection MouldAuto Engine Plastic Part Injection MouldSpecialize in plastic Injection Mold/Hot Runner Mold/Gas Assistant Mold/High Glossy Mold/2K Injection Mold/Over Mold/IML/Stack Mold.
Professional Auto Engine Part Mould Manufacturer over 10 years, certificated by ISO 9001: 2008.

Advantage:

High quality & competitive price & professional skills.
In house strict quality control.
On time delivery.
All mold could be produced automatically

Specification:
Item: Plastic Injection Mold
Part Material: PC/PP/PBT/ABS/PMMA/PU/PE/PVC
Core &Cavity Steel: P20/H13//GS2344/NAK80/ASSAB718HASSAB8407
Mold Base Steel: P20/1050/S50C/
Runner: Hot or Cold
Gate Type: Sprue Gate/Pin Point Gate/Edge Gate/Submarine Gate/Fan Gate/Ring Gate
Cavity No: Single or Multiple.
Mold Base Standard: DME/LKM/HASCO/Etc.
Spare Parts Standard: DME/HASCO/DAIDO/MISUMI/Customized is acceptable.
Mold Life: 30k-1, 000 k
Cycle Time: 10-120 s
Lead Time: 30-45 days
Injection Machine: 50-1200 Ton

Offered Service:
Mold progress report and tooling schedule will be provided weekly.
The first testing sample for buyer's inspection and work out improvement requirements will be provided.
Mold testing video, 2D part drawing and 3D mold design before shipment will be provided.

Payment and Delivery
Payment: TT 50% in advance, Balance before shipment
Delivery Time: 30-45 days


Updated on 17/06/19