Automotive Plastic Engine Cover Mould

China Automotive Plastic Engine Cover Mould, Find details about China Plastic Mould, Plastic Injection from Automotive Plastic Engine Cover Mould

Model NO.
RTPM
Runner
Hot Runner
Design Software
UG
Installation
Fixed
Certification
TS16949, CE, ISO, FDA
Standard
DME
Customized
Customized
Hot Runner
Yudo
Core Steel
Customized
Lead Time
60-90 Days
Injection Machine Size
780-1200 Tons
Trademark
Root
Transport Package
Wooden Box
Specification
CE/SGS/RoSH
Origin
Qingdao Shandong
HS Code
8480790090
Model NO.
RTPM
Runner
Hot Runner
Design Software
UG
Installation
Fixed
Certification
TS16949, CE, ISO, FDA
Standard
DME
Customized
Customized
Hot Runner
Yudo
Core Steel
Customized
Lead Time
60-90 Days
Injection Machine Size
780-1200 Tons
Trademark
Root
Transport Package
Wooden Box
Specification
CE/SGS/RoSH
Origin
Qingdao Shandong
HS Code
8480790090
Professional Plastic Injection Mould Manufacturer with about 10 years experience, specializing in Plastic Injection Mould with Cold&Hot Runner/Gas Assistant Mould/High Glossy Mould/2K Injection Mould/IML/Stack Mould.
Automotive Plastic Engine Cover Mould
Automotive Plastic Engine Cover MouldAutomotive Plastic Engine Cover MouldAutomotive Plastic Engine Cover Mould
Specification:
Part Material: PC/PP/PBT/ABS/PMMA/PU/PE/PVC
Core &Cavity Steel: P20/H13//GS2344/NAK80/ASSAB718HASSAB8407
Mold Base Steel: P20/1050/S50C/
Runner: Hot or Cold
Gate Type: Sprue Gate/Pin Point Gate/Edge Gate/Submarine Gate/Fan Gate/Ring Gate
Cavity No: Single or Multiple.
Mold Base Standard: DME/LKM/HASCO/Etc.
Spare Parts Standard: DME/HASCO/DAIDO/MISUMI/Customized is acceptable.
Mold Life: 30k-1, 000 k
Cycle Time: 10-120 s
Lead Time: 30-45 days
Injection Machine: 50-1600 Ton

Advantage:
High quality & competitive price & professional skills.
In house strict quality control.
On time delivery.
All mold could be produced automatically

Offered Service:
Mold progress report and tooling schedule will be provided weekly.
The first testing sample for buyer's inspection and work out improvement requirements will be provided.
Mold testing video, 2D part drawing and 3D mold design before shipment will be provided.

Payment and Delivery
Payment: TT 50% in advance, Balance before shipment(Negotiable).
Delivery Time: 30-45 days
Specification
Design Software:UG/CAD
Analysis Software:Moldflow
Preferred Formats:STP/IGES/UG
Design Time:7-15 days
Manufacture Time:20-30 days
Delivery Time:30-45 days