China Ultrasonic Non Woven Bag Sealing Machine High Output Non Woven Bag Making Machine, Find details about China High Speed Non Woven Bag Making Machine, Non Woven Bag Box Type Bag Making Machine from Ultrasonic Non Woven Bag Sealing Machine High Output Non Woven Bag Making Machine
Model | A8(Standard Mode) | A8(Special Model) |
Power | Average 15-20kw | |
Power Supply | 380V 3P 50/60HZ | |
Material | Non Woven (Laminating) | |
Material Thickness | 50-120g | |
Bag-Making Speed | 40-68pcs/min | 30-60pcs/min |
Bag Front Width | 150-570mm | 150-600mm |
Bag Height | 150-450mm | 150-500mm |
Bag Side Width | 70-200mm | 70-300mm |
Handle Length | 400-600mm | 400-700mm |
Feeding Width | 550-1120mm | 500-1550mm |
Feeding Length | 335-700mm | 300-870mm |
Machine Weight | 11500kg | 12500kg |
Dimension(LxWxH) | 11500mm |
1.How to start an order with us ?
1. Inquiry -Email Wechat/whatapp 24 hours available for have your requirements
2. Solution offer - Best quotation based on your production capacity ,invest plan ,budget ect.
3. Customized -High-end customized according your local market requirement.
4. Preparation before placing order -Share us your factory layout ,we will design it the machine space ,air ,power ,electric accordingly ,invite you come to visit our machinery factory or our model customer's factory to understand details .
5. Confirm the order -With the advanced payment for starting machine prodcution .
2.How to check the quality of the machine you ordered and the guarantee ?
1.Production process -We will show online meeting at our factory working time for machinery procss from the raw material inspection to machine assembly,8 hours running the machine for testing is most important
2.Quality control -Each part is marked with the source code of the supplier, and the real name of each production link is assessed,12 months Warranty,We would express the free replacement parts during the warranty date.
3.Delivery- Packing according to international shipping, railway or air Shipping tracking standard ,Tracking information will be keep updated by our side .
3.How about the Installation and training when the machine arrive your factory ?
1.Installation -Engineer Schedule confirmed 7 days before machinery arrival ,7-10days for installation depend on the machine operation difficulty . 2.Training -Due to virus,buyer cannot dispatch technician to install machine in buyer's factory.But will provide machine operating manual and machine disassemble video for reference.If buyer meet some problems during installation,will have engineer online,but the buyer require to download Wechat apply for a account as other foreign app doesn't work in China.
3.Cost of Installation & Training :You shoud cover our engineer's visa, air tickets,SIM card, hotel, food, and also their salary 80USD one day per person.