China Concentric Casing System with Blocks, Find details about China Overburden System, Symmetrix Casing System from Concentric Casing System with Blocks
Part | Model | ||||
PA90 | PA115 | PA140 | PA165 | PA190 | |
Casing Tube(max.O.D.)(mm) | 115 | 142 | 171 | 195 | 222 |
Casing Tube (min.O.D.) (mm) | 102 | 128 | 155.6 | 182.6 | 205 |
Guide Sleeve | Effective length: 174mm | Effective length: 174mm | Effective length: 205mm | Effective length: 225mm | Effective length: 250mm |
Drill Pipe | Connection Thread: API2 3/8"Reg; O.D.: 76mm; Wrench Flats: 65mm | Connection Thread: API2 3/8"Reg; O.D.: 76mm; Wrench Flats: 65mm | Connection Thread: API2 3/8"Reg O.D.: 89mm Wrench Flats: 65mm | Connection Thread: API3 1/2"Reg O.D.: 114mm Wrench Flats: 95mm | Connection Thread: API3 1/2"Reg O.D.: 114mm Wrench Flats: 95mm |
DTH Hammer | DHD35, COP2, MISSION30 | COP44, DHD340, MISSION40 | DHD55, COP54, MISSION50 | COP64, DHD360, MISSION60 | COP64,DHD360, MISSION60 |
Casing Shoe | L3=90mm L4=55mm D3=101.7mm D4=93mm | L3=76mm L4=55mm D3=127.5mm D4=117mm | L3=90mm L4=63mm D3=155.3mm D4=143mm | L3=95mm L4=55mm D3=181.5mm D4=166mm | L3=110mm L4=70mm D3=204.7mm D4=193mm |
Guide Device | L1=35mm L2=138mm D1=92mm D2=100mm | L1=48mm L2=136mm D1=115mm D2=126mm | L1=55mm L2=160mm D1=141mm D2=154mm | L1=61.5mm L2=181.5mm D1=165mm D2=178mm | L1=62.8mm L2=185mm D1=191mm D2=203mm |
Reamer | D5=91mm L5=70mm Reaming Diameter: 123mm; Reamer has 4*Ф12 buttons | D5=114mm L5=89mm Reaming Diameter: 152mm Reamer has 5*Ф14 buttons | D5=138mm L5=69.5mm Reaming Diameter: 185mm Reamer has 7*Ф14 buttons | D5=164mm L5=79.5mm Reaming Diameter: 211mm Reamer has 7*Ф14 buttons | D5=185.5mm L5=90.2mm Reaming Diameter: 237mm Reamer has 7*Ф16 buttons |
Pilot Bit | D6=90mm L6=59mm Gauge button: 8*Ф12 Front button:6*Ф10 | D6=114mm L6=67mm Gauge button: 8*Ф14 Front button:6*Ф12 | D6=138mm L6=66mm Gauge button: 8*Ф16 Front button:8*Ф14 | D6=165.8mm L6=82.5mm Gauge button: 8*Ф16 Front button:8*Ф16 | D6=190mm L6=82mm Gauge button: 9*Ф18 Front button:9*Ф16 |
A:When drilling starts working,reaming sleeve will open,borehole range will increase,which will casing shoe and casing tube. |
B:When finish drilling in overburden layer,pay attention to reverse circulation,reaming sleeve circles up,eccentric drilling bit lifts out from the borehole. |
C:The casing that can be left in the borehole to prevent borehole from collapsing while pulling out pipe and grouting concrete. |
D:Regular drilling bits can be applied to drill the depth as required in the rock stratum. |
Q1: Can I have a sample for testing?
A:Samples are still to be paid but discounted price can be provided.
Q2: Do you have the inspection procedures?
A:100% strict inspection and testing for every order before packing.
Q3: How can i get the after sale services?
A:Free replacement will provide once the problems casued by our product quality.
Q4: Can I have a visit to your factory before the order?
A: Sure, welcome, here is our address: Yantai, Shandong.