Quality Brass Forged Pipe Equal Tee (AV-70024)

China Quality Brass Forged Pipe Equal Tee (AV-70024), Find details about China Fitting, Brass Fitting from Quality Brass Forged Pipe Equal Tee (AV-70024)

Model NO.
AV-70024
Wall Thickness
STD
Finish
Anti Rust Oil
Technics
Forged
Pressure Rating
2000LBS
Standard
ASTM
Certification
ISO
Color
Golden
Size
OEM
Inner Clamp
Brass
Connect Pipe
Thread Pipe
Trademark
ITALYCOPPER
Transport Package
Standard Export Package
Specification
1/2"
Origin
Zhejiang, China
HS Code
74122010
Model NO.
AV-70024
Wall Thickness
STD
Finish
Anti Rust Oil
Technics
Forged
Pressure Rating
2000LBS
Standard
ASTM
Certification
ISO
Color
Golden
Size
OEM
Inner Clamp
Brass
Connect Pipe
Thread Pipe
Trademark
ITALYCOPPER
Transport Package
Standard Export Package
Specification
1/2"
Origin
Zhejiang, China
HS Code
74122010
QUALITY FORGED BRASS PIPE EQUAL TEE (AV-70024)

SPECIFICATION

Material: Brass, Lead free brass, DZR

Size: 1/4"~2"

Thread: 

ITEM
DesignationMaterial
1MaterialBrass (CW617N, DZR, Bronze, Lead free brass )
2Size1/8"~2"
3ThreadISO228(BSP, BSPT, NPT )
4ClampRound. Brass
5PackPlastic bag, inner box, cartob
6TypeEqual Tee, Reduce Tee
7ShapeCustomized

Fittings
Quality Brass Forged Pipe Equal Tee (AV-70024)
Quality Brass Forged Pipe Equal Tee (AV-70024)






OUR SERVICES
Quality Brass Forged Pipe Equal Tee (AV-70024)


Samples: 
1) we can make the samples according to customer's samples or designs. 
2) Our designer team can finish the samples timely, the exact sample delivery time depends on thesample's style, usually in 15 working days. 
3) For New design samples, the buyers have to pay for the relative model fee. (When your order reach a certain amount, we will return back the model fee to you

Price Terms: 
FOB, CNF, CIF. etc. 
WE ACCEPT MANY RATE, SUCH AS RMB, US DOLLAY, EUR, KORAD, POUND...etc

Payment Terms: 
1) T/T, 30% T/T deposit before production, pay the balance before shipment. 
2) L/C at sight (for large quantity order)
3) 100% T/T in advance, D/P

Order and Mass Production: 
1) We will send PROFORMA INVOICE to you when the order is confirmed. 
2) We will start to have mass production when confirm our sample and 30% T/T deposit received. 
3) Quality is under the control and supervision during the production. 
4) Packing information will be confirmed before the production finished, If no special requirment, using our normal package. 
Quality Brass Forged Pipe Equal Tee (AV-70024)

Quality control and inspection: 
Quality Brass Forged Pipe Equal Tee (AV-70024)

Quality Brass Forged Pipe Equal Tee (AV-70024)




1) Will be check by QC when Material & accessories inspection up arrival
2) In line control on Each Step
3) Every one valve will be comprehensive review before packing
4) Sales will be spot check before shipping
5) Third Party inspection Such as CE, SABS and so on
6) Original authorization through ISO9001: 2008