Clinker Cement Mill for Cement Industry

China Clinker Cement Mill for Cement Industry, Find details about China Clinker Cement Mill, Clinker Grinding Mill from Clinker Cement Mill for Cement Industry

Model NO.
Various Model
Condition
New
Weight of Ball
1.5t
Certificate
ISO9001, ISO14000, Ce
Model
Reference to The Form
Feeding Size
<25mm
Weight
Depends The Machine
Color
as Your Request
Factory Established
1956
After Sale Service
for The Whole Using Life
Power
18.5
Technical Parameters
See Technical Table
Trademark
ZK
Transport Package
According to Your Special Requirements
Specification
Various
Origin
Zhengzhou, China
HS Code
8474202000
Model NO.
Various Model
Condition
New
Weight of Ball
1.5t
Certificate
ISO9001, ISO14000, Ce
Model
Reference to The Form
Feeding Size
<25mm
Weight
Depends The Machine
Color
as Your Request
Factory Established
1956
After Sale Service
for The Whole Using Life
Power
18.5
Technical Parameters
See Technical Table
Trademark
ZK
Transport Package
According to Your Special Requirements
Specification
Various
Origin
Zhengzhou, China
HS Code
8474202000

Clinker Cement Mill for Cement Industry

1.   200tpd Cement Mill Clinker Grinding Line:

Cement mill is the key equipment for grinding after the crush process, which is widely used in the manufacture industries, such as cement, silicate, new building material, refractory material, fertilizer, ferrous metal, nonferrous metal and glass ceramics, and can be used for the dry and wet grinding for all kinds of ores and other grind-able materials.

Cement mill is the key equipment for re-grinding the cement clinker after it is distributed by the system and primarily crushed. Raw Material Mill is mainly used in the cement silicate product production industry.

Clinker Cement Mill for Cement Industry

2. The Advantages of our company as cement mill-2016 New Professional 200tpd Cement Mill Clinker Grinding Line:

1. We have been this line for more than 30 years.

2. Our technical is mature.

3. We have our own R&D department.

4. We have devoted ourselves in the international trade for more than 3 years, so we have rich experience

3. Our cement mill's characteristics-2016 New Professional 200tpd Cement Mill Clinker Grinding Line:

As for different types of cement mills, we use proper driving method and the main driving methods include edge driving and center driving. Inside the cylinder, there are new type classification lining board and standard ladder lining board, which increases the grinding surface of the materials, and the classification effect is better and the follow-up maintenance and spare parts changing are easier. The new partition structure uses adjustable lifting board and fixed lifting board which are easy to install and maintain.

Clinker Cement Mill for Cement Industry
 

Technical Parameters of cement Ball Mill


Specification


Output (t/h)


Rev
(R/min)


Grinding
Body(t)

Electromotor

Reducer

 

 

 

 

Model

Power(kw)

Model

Ratio of  speed

Ф1.2x4.5

1.4

30.3

2

YR250M-6

55

ZD30-8

4.481

Ф1.5x5.7

3.5

26.34

11

JR127-8

130

ZD40-7

4

Ф1.83x6.4

6

23.9

18

JR137-8

210

ZD60-8

4.5

Ф1.83x7

6.5

24.5

20

JR138-8

245

ZD60-8

4.5

Ф2x9

9.5-10

23.88

31

JR158-8

380

ZD70-8

4.5

Ф2.2x6.5

8-9

21.4

30

JRQ158-8/YR630-8

380

ZD70-8

5

Ф2.2x6.5

14

21.4

30

JRQ158-8/YR630-8

380

ZD70-9

5

Ф2.2x7

12

21.4

30

JR158-8

380

ZD70-9

5

Ф2.2x7.5

13

21.4

32

JR158-8

380

ZD70-9

5

Ф2.2x8

11-12

21.4

37

JR158-8

380

ZD70-9

5

Ф2.2x9.5

14-16

21.4

43

JR1510-8

475

ZD70-9

5

Ф2.2x13

16

20.3

55

YR630-8/1180/Y100L-8

630/11

JD630/ZS82.5-7

6.3/99.96

Ф2.4x7

14-16 Closed-circuit

20.4

36

JR1510-8

475

JDx450

5

Ф2.4x8

16-17 Closed-circuit

20.3

41

JR1512-8/Y180L-8

570/11

JD630/ZS82.5-7

6.333/99.96

Ф2.4x9

17-1 Closed-circuit

20.3

46

YR630-8/1180/Y100L-8

630/11

JD630/ZS82.5-7

6.333/99.96

Ф2.4x10

18-19 Open circuit 20-22 Closed-circuit

20.3

50

YR630-8/1180/Y100L-8

630/11

JD630/ZS82.5-7

6.333/99.96

Ф2.4x11

19-21 Open circuit

20.3

60

YR630-8/1180/Y100L-8

630/11

JD630/ZS82.5-7

6.333/99.96

Ф2.4x12

25-27Open circuit

20.3

61

YR800-8/1180/Y100L-8

800/11

JD630/ZS82.5-7

6.333/99.96

Ф2.4x13

25-27 Open circuit

20.3

66

YR800-8/1180/Y100L-8

800/11

JD630/ZS82.5-7

6.333/99.96

Ф2.4x13

21-23 Open circuit

20.3

66

YR1000-8/1180/Y160M-4

1000/11

JD630/ZS82.5-7

6.333/99.96

Ф2.6x10

25-27 Closed-circuit

20.3

60

YR800-8/1250

800

JD800

5.5

Ф2.6x13

27-29

19.1

 

YR1000-8/1180/Y160M-4

1000/11

 

5.5/280

Ф3x9

33-34Open circuit

19.6

79

YR1000-8/1180/Y160M-4

1000/11

NAL108/8/ZS110-19

8/280

Ф3x9

36.5 Open circuit

17.6

 

YR118/61-8

1000

 

42.163

Ф3x11

35-40 Open circuit

18.3

97

YR1250-8/1430/YR160M-4

1250/11

YNL1210

6.3

Ф3x11

47Open circuit

17.7

 

YR118/74-8

1250

 

42.39

Ф3x12

38-40 Closed-circuit

18.1

 

YR1250-8/1430

1250/11

 

41.27

Ф3.2x11

40 Closed-circuit

18

103

YR1400-8/1430/Y160M-4

1400/11

YNL1210/ZS110-19

12.35/28

Ф3.5x11.5

65-70Open circuit

16.5

 

TYD143/49-8

2-1000

 

36.239

Ф3.5x11.5

50 Closed-circuit

17.2

126

YR1800-8/1430/Y200L2-2

1800/37

JSX1300A/JMX560

43.02/318

Ф3.8x13Double

sliding shoe

70-75 Closed-circuit

16.6

 

YRKK800-8

2500

 

44.9

Ф3.8x13

60-62

16.3

170

YR2500-10/1730

2500

MFYX250

 

Ф4x13

65 Closed-circuit

15.95

202

YRKK900-8

2800

JS130-8

46.7

Ф4.2x13

85 Closed-circuit

16.3

224

YRKK900-8

3150

MFY320

47.8

Ф4.2x13

85-87

16.3

224

YR1000-8

3530

JQS3550

15.

Company Information

Henan Zhengzhou Mining Machinery Co., Ltd is located in Wulong Industrial Park of Zhengzhou Xingyang which is the capital of Henan Province. It is at the junction of 310 State Road and Xingmi Road, close to the highway, railway station, West Zhongyuan Road, downtown area of Zhengzhou and Zhengzhou International Airport. The transportation condition is very convenient.

ur service is excellent and fast feedback.

Clinker Cement Mill for Cement Industry

Pre-sales: We have engineer to select ball mill size (model) according to customer's information, and provide Consultation, design.

During sales: We send our experienced engineer onsite to supervise installation and commissioning. 

After sales: We provide 1 year guarantee period, if there is any quality problem, we will replace spare parts for free.

We always keep certain inventory level of spare parts, which means the replacements can be shipped to you right away.

In addition, we will regularly pay return visit to our customers.

Clinker Cement Mill for Cement Industry