Pump Controller Reserved Space for Installing Capacitor

China Pump Controller Reserved Space for Installing Capacitor, Find details about China Motor Starter, Automatic Pump Controller from Pump Controller Reserved Space for Installing Capacitor

Model NO.
S521
Output Power
0.37-2.2kw
Frequency
50Hz
Phase
Single Phase
Control Qty
One Pump
Trademark
Leading Science & Technology
Transport Package
Paper Carton
Specification
CE
Origin
China
HS Code
90328990
Model NO.
S521
Output Power
0.37-2.2kw
Frequency
50Hz
Phase
Single Phase
Control Qty
One Pump
Trademark
Leading Science & Technology
Transport Package
Paper Carton
Specification
CE
Origin
China
HS Code
90328990
1.Product Information

SINGLE PUMP CONTROL PANEL
MODEL: S521
 
ModelS521
Main technical data 
.Start typeDirect on line
. Qty of controlled pumpSingle pump
. Rated input voltage:AC220V-240V Single phase
50HZ/ 60HZ
. Rated output power:0.37kw-2.2kw (0.5hp-3hp)
.Capacitor:Reserved space for installing start capacitor
 
 
Product function
 
Over load protection
Pump stalled protection
Dry run protection with sensor free
Under voltage protection
Over voltage protection
 
 
Application &
Control characteristic
Control and protect universal pump
Using water level sensor or float switch to control pump start and stop
Applied for water supply by liquid level control through float switch or liquid probe
Applied for water supply by pressure control through pressure switch and pressure tank
Applied for drainage by liquid level control through float switch or liquid probe
 
Other features
Push button calibration
Memory function when power off & recovery
Main installation data 
Working temperature
Working humidity
Degree of protection
Install position
Unit dimension (L x W x H)
-25ºC-- +55ºC
20%--90%RH, no drips concreted
IP22
Wall mounting
170× 155× 85mm
  
2.Company  Information 

1)Brief introduction: as the supplier of pump control panel and control accessories, major products including: Intelligent Single / Dual Pump Control Panel, Motor Protector / Starter , Reverse Osmosis Controller, Anti-Clogging Reversal Pump Control Panel 
More information, please visit: pumpcontroller.en.made-in-china.com
 
2)Our location and communication
From Guangzhou to Changsha takes 1hour by air, 2.5hour by high speed train
From Shanghai to Changsha takes 1.5hour by air, 5hour by high speed train
From Beijing to Changsha takes 2.5hour by air
From Hong Kong to Changsha takes 2hour by air
 
Pump Controller Reserved Space for Installing Capacitor
Pump Controller Reserved Space for Installing Capacitor
Pump Controller Reserved Space for Installing Capacitor
Pump Controller Reserved Space for Installing Capacitor