China Ei19 Ei24 Ei26 Ei28 Ei35 Ei48 Ei66 PCB Chasis Transformer 50Hz Ei Laminated Transformer with CB, IEC Approval, Find details about China 220V 240V 230V 12V Ei48 Ei66 Transformer, 220 230V 240V PCB Chasis Transformer from Ei19 Ei24 Ei26 Ei28 Ei35 Ei48 Ei66 PCB Chasis Transformer 50Hz Ei Laminated Transformer with CB, IEC Approval
50hz Ei Laminated Class Chasis Transformer with IEC Certificates
Name:
EI19 EI24 EI26 EI28 EI35 EI48 EI66 Core 50Hz Ei laminated core Transformer with CB, IEC certificates :
1.Specifications
2.Technical ParameterTable:
Brand Name: | GREWIN Transformer | Mode; | EI | Coil number: | Autotransformer |
Phase: | Single | Core structure | Lamination | Coil structure: | Toroidal |
Power: | 0.15-1,500W | Input Voltage | AC380V-240V-230V-220V-120V-110V-100V | ||
Application | Instruments ;Communication products | Output Voltage | AC(0--380V); DC(0--50V) | ||
Deliver time | 15 working days | Package | Customized standard cartons | ||
ATTENTION: | YOU CAN CUSTOMIZED ALL SERIERS ACCORDING TO YOUR REQUERMENT |
Model | Power | Dimension(cm) | Weight (KG) | Voltage regulation | Approval mark | ||||
A(cm) ±1.5 | B(cm) ±2 | C(cm) ±2 | D(cm) ±2 | E(cm) ±2 | |||||
GWT-EI28 | 1.5W | 43 | 30 | 38 | 28 | 0.11 | 35 | CE,TUV, | |
GWT-EI35 | 3.0W | 47 | 37 | 38 | 33 | 0.15 | 22 | CE,TUV, | |
GWT-EI41 | 11.0W | 54 | 43 | 47 | 35 | 0.32 | 16.5 | CE,TUV, | |
GWT-EI48 | 25.0W | 62 | 50 | 65 | 43 | 0.57 | 13.1 | CE,TUV, | |
GWT-EI57 | 40.0W | 73 | 59 | 65 | 51 | 0.84 | 11.8 | CE,TUV, | |
GWT-EI66 | 80.0W | 83 | 68 | 80 | 58 | 1.38 | 9.3 | CE,TUV, | |
GWT-EI76 | 140W | 64 | 70 | 76 | 85 | 68 | 2.25 | 7.6 | CE,TUV, |
GWT-EI86 | 180W | 72 | 75 | 86 | 92 | 73 | 2.82 | 7.1 | CE,TUV, |
GWT-EI96 | 250W | 80 | 81 | 96 | 90 | 82 | 3.36 | 6 | CE,TUV, |
Grewin's chasis Type Transformer/PCB EI transformers:
1.Product Feature :
We can manufacture EI Power Transformers.Below is our mainly products with much advantages in our market:
Custom mains transformers 50/60 Hz
Transformers with particular core requirements such as size, finish, pins layout, input and output voltage. | |
Where PCB does not allow the use of mains transformers encapsulated in resin we can supply air transformers with plastic shell for the protection of windings and the improvement of creepage-clearance. | |
custom transformers are manufactured according to the technical and safety requirements from clients. As an example, here you can find some of the most common features you can easily request: | |
Primary and secondary windings in separate sections | |
Encapsulation in epoxy resin or insulating varnish dipping. | |
Hot-dip tin coated phosphor bronze pins | |
Pin size: Max diameter = 0,90mm , Minimum length = 4mm | |
5KV Primary to Secondary dielectric strength | |
100% tested | |
On request they can be tested to meet CEI EN61558-1(CEI 96-3) e CEI EN 61558-2-6 (CEI 96-7) safety standards. |
2.product procedure:
The following picture showed you about all finished transformer production line and package with export standard carton and strong pallets:Application: | Electronic, Instrument, Position Sensor, Audio, Lighting |
---|---|
Type: | Ei Core Structure |
Phase: | Ei28 Ei35 Ei41 Ei48 Ei57 Ei66 Ei76 Transformer |
Operation Condition: | Indoor |
Usage: | . Measuring Instruments;Communication Prducts. |
Winding Form: | Multilayer Honeycomb Type |
Model | Power | Dimension(cm) | Weight (KG) | Voltage Regulation | Approval Mark | ||||
A(cm) ±1.5 | B(cm) ±2 | C(cm) ±2 | D(cm) ±2 | E(cm) ±2 | |||||
GWT-EI28 | 1.5W | 43 | 30 | 38 | 28 | 0.11 | 35 | CE,TUV, | |
GWT-EI35 | 3.0W | 47 | 37 | 38 | 33 | 0.15 | 22 | CE,TUV, | |
GWT-EI41 | 11.0W | 54 | 43 | 47 | 35 | 0.32 | 16.5 | CE,TUV, | |
GWT-EI48 | 25.0W | 62 | 50 | 65 | 43 | 0.57 | 13.1 | CE,TUV, | |
GWT-EI57 | 40.0W | 73 | 59 | 65 | 51 | 0.84 | 11.8 | CE,TUV, | |
GWT-EI66 | 80.0W | 83 | 68 | 80 | 58 | 1.38 | 9.3 | CE,TUV, | |
GWT-EI76 | 140W | 64 | 70 | 76 | 85 | 68 | 2.25 | 7.6 | CE,TUV, |
GWT-EI86 | 180W | 72 | 75 | 86 | 92 | 73 | 2.82 | 7.1 | CE,TUV, |
GWT-EI96 | 250W | 80 | 81 | 96 | 90 | 82 | 3.36 | 6 | CE,TUV, |
NO | Step | Days need |
1 | Request for quotation | 1 day |
2 | Making quotations | 1 day |
3 | Offer and counter offer | 3 days |
4 | Sending and receiving samples | 3-10 days |
5 | Sample confirmation | 3 days |
6 | Placing a firm order | 1 day |
7 | Paying and receiving the down payment | 1-4 day |
8 | Factory production & Quality inspection | 15-20 days |
9 | Paying and receiving the balance | 4 days |
10 | Delivery of goods | 1 days |