Blue Drilling Tool Centrifugal Soil Drilling Bucket with Open Body

China Blue Drilling Tool Centrifugal Soil Drilling Bucket with Open Body, Find details about China Soil Drilling Bucket, Centrifugal Soil Drilling Bucket from Blue Drilling Tool Centrifugal Soil Drilling Bucket with Open Body

Model NO.
Soil Drilling Bucket
Kelly Box
130*130/ 150*150/ 200*200mm
Od
600-1500mm
Trademark
FES/ OEM
Transport Package
Seaworthy Packing
Specification
Size as Per Inquiry for Customization
Origin
China
HS Code
8431432000
Model NO.
Soil Drilling Bucket
Kelly Box
130*130/ 150*150/ 200*200mm
Od
600-1500mm
Trademark
FES/ OEM
Transport Package
Seaworthy Packing
Specification
Size as Per Inquiry for Customization
Origin
China
HS Code
8431432000
Blue Drilling Tool Centrifugal Soil Drilling Bucket with Open Body

Main application: Soil, mudstone, sandstone, clay.

Blue Drilling Tool Centrifugal Soil Drilling Bucket with Open Body
 
ODTube diameterBucket heightCut diameterTeeth typeTeeth quantity Weight
mmmmmmmm pcKg
6005001200560Optional4950
700580120066051120
800680120076061280
900780120086071450
1000840120096081600
11009401200106091850
1200102012001160102080
1300114012001260112450
1400124012001360122700
1500134012001460122950

Features

- Kelly box: Bauer Sany Soilmec IMT standard 150*150,200*200 or as required.
- Bucket thickness can be made 16mm or 20mm as customer's demand
- The single bottom plate thickness:50mm
- The double bottom plate thickness:40/50mm
- Teeth type: V19 or V20, 25T
- Drilling Diameter Range: 600~2500mm
- Barrel Length: 800~1500mm


 

Main Applications                   

 

Centrifugal soil drilling buckets are used to drill soil, hard soil, and argillite formation; drill in clay, silt, and loose to medium dense sand, gravel, and medium hard rocks, etc.

- Large inlet of soil, open-shell design easy to dump spoil to increase the drilling efficiency.

- Super strength structure for the shell, guide plate to increase the life cycle of the bucket.

- Guide strips arranged on the surface of the bucket to avoid drilling tools sucked by the pressure.


Features of FES Drilling Tools:

Blue Drilling Tool Centrifugal Soil Drilling Bucket with Open Body
Blue Drilling Tool Centrifugal Soil Drilling Bucket with Open Body
Blue Drilling Tool Centrifugal Soil Drilling Bucket with Open BodyBlue Drilling Tool Centrifugal Soil Drilling Bucket with Open Body
Blue Drilling Tool Centrifugal Soil Drilling Bucket with Open Body
Intro of FES:

Blue Drilling Tool Centrifugal Soil Drilling Bucket with Open BodyBlue Drilling Tool Centrifugal Soil Drilling Bucket with Open Body
Blue Drilling Tool Centrifugal Soil Drilling Bucket with Open Body
Blue Drilling Tool Centrifugal Soil Drilling Bucket with Open Body
Blue Drilling Tool Centrifugal Soil Drilling Bucket with Open Body

Blue Drilling Tool Centrifugal Soil Drilling Bucket with Open Body
- 15+ years of experience in the foundation drilling industry
- One-stop foundation equipment solution provider
- More than 120 well-established sales and technicians
- Excellent services on the highest industry standard
- Constant innovation on the new products
- Customized configuration products for targeted territories
- Sponsorship on factory tours
- Flexible financing support


FAQ:

Q: What's the product range of FES?
A: FES produces a full range of tools for deep foundation engineering, such as drilling buckets, drilling auger, kelly bar, casings, drill bits, CFA, DTH, and other pilling tools.

Q: Is the factory visit available?

A: Yes! We welcome customers to visit our factory anytime. Besides the factory visit, the third-party inspection before delivery is also available.

Q: What is the advantage of FES?
A:  We have a professional team and production line with quality control.

Q: Any other good service FES can provide?

A: We can provide good after-sales service and fast delivery.

Q: Why should I choose FES products?
A: We can provide products of high quality and competitive prices.

Q: What is the payment term?
A: We accept TT, L/C, D/P, Western Union.

Q: What is the lead time?
A: The lead time is generally 7-14 working days for spare parts and 25-35 working days for large machinery. The specific lead time will be offered in each quotation sheet.