Construction Equipment Tower Crane Qtz315 Max Load 16t

China Construction Equipment Tower Crane Qtz315 Max Load 16t, Find details about China Crane, Tower Crane from Construction Equipment Tower Crane Qtz315 Max Load 16t

Model NO.
QTZ315
Type
Top-Slewing Crane
Model
Tc7040
Free Standing Height
60m
Max Height
230m
Max Load
16t
Tip Load
4t
Jib Length
70m
Power
220V 50Hz
Mast Section
2X2X3m
Material
200X200X20, Q235B Angle Steel
Color
Yellow Red
Application
Construction Usage
Power Source
Hydraulic
Sling Type
Wire Rope
Tower Crane Type
Slewing Tower Crane
Main Girder Form
Double Girder
Trademark
Minglong
Transport Package
Sea Worthy Package in Container
Specification
ISO9001, CE
Origin
China
HS Code
8426200
Model NO.
QTZ315
Type
Top-Slewing Crane
Model
Tc7040
Free Standing Height
60m
Max Height
230m
Max Load
16t
Tip Load
4t
Jib Length
70m
Power
220V 50Hz
Mast Section
2X2X3m
Material
200X200X20, Q235B Angle Steel
Color
Yellow Red
Application
Construction Usage
Power Source
Hydraulic
Sling Type
Wire Rope
Tower Crane Type
Slewing Tower Crane
Main Girder Form
Double Girder
Trademark
Minglong
Transport Package
Sea Worthy Package in Container
Specification
ISO9001, CE
Origin
China
HS Code
8426200
Construction tower crane QTZ315(TC7040)

1. Brief introduction of TC7040
1.1 Working mechanisms
The performance of hoisting mechanism, slewing mechanism, trolleying mechanism and traveling mechanism directly affects the whole performance of the tower crane. Users hope that the crane is stable and reliable in working. The main factor influenced the stability of the crane is inertial impact and electric current impact. "Mingwei" has solved those knotty problems with advanced technology in the TC7040 tower crane.
1.1. 1 Hoisting mechanism
The hoisting mechanism of the TC7040 tower crane is designed to lift 18 tons.
The hoisting mechanism lifting 18 tons is adopted the frequency altering and stepless speed regulated motor. Starting and braking smoothly, it is very outstanding to improve the mechanism running stability, raise the accuracy of filling its shoes, simplify the operation, have no impact to electric network, prolong the component lifetime of the electric system, and prolong the lifetime of the wire rope.
Using the frequency altering and stepless speed regulated motor and single-velocity-ratio spur gear reducer, the mechanism has simple structure, high reliability and easy maintenance.
Adopting the technology of big strong drum with LEBUS groove, it is very useful to solve the knotty problem of abnormal orders when the wire rope is arranged on the drum.
1.1. 2 Slewing mechanism
As opposed to other mechanisms, the inertial impact of the slewing mechanism has the most effect to the crane. The more the jib is long, the more effect is outstanding. It can't solve the knotty problem with the traditional slewing mechanism, which brings about big torsional pendulum impact on the crane. After the motor being powered off, the jib runs for a long time before stopping, lead to difficultly fill its shoes and damage the slewing reducer.
The unique technology of frequency altering and stepless speed regulated is adopted in the routine slewing mechanism of tower cranes. The slewing mechanism starts and stops smoothly, fills its shoes fast and correctly.
1.2.3 Trolleying mechanism
The trolleying mechanism, which affects the load filling its shoes, is important mechanism. Using the technology of frequency altering and stepless speed regulated, the speed of the trolley changes in the range of 0~100m/min, it is very efficient to reduce the running impact and improve the operating stability and working efficiency in TC7040.

Construction Equipment Tower Crane Qtz315 Max Load 16t

 
Hoisting  mechanismModel 70RCS40
Model  of  motor YRTE3-180L-4B5
PowerKW51.5× 2
Hoisting  speed2  falls/loadm/min60/430/8
4  falls/load30/815/16
Slewing  mechanismModel RCV185B
Model  of  motor YTLEJ132L-185-4B1
Torque  of  motorN. m185× 2
Slewing  speedr/min0~0.7
Trolleying  mechanismModel X185K
Model  of  motor YTLEJ132L-185-4B1
Trolleying  speedm/min40/20/10
Jacking  speedm/min0.4
Outsize  of  whole  craneTip  of  hoisting  jib  to  slewing  center 71.72
Tip  of  balanced  jib  to  slewing  center19.2
Balanced  weightt29
Allowed  work  temperature -20~+40
Basic  wind  pressure  under  workPa250
Basic  wind  pressure  out  of  workPa1100
Power  supply50Hz~380V± 10%
 
Construction Equipment Tower Crane Qtz315 Max Load 16tConstruction Equipment Tower Crane Qtz315 Max Load 16t