China ABS PC Virgin Granules Fire Retardant V0 PC ABS Alloy Plastic Raw Material, Find details about China PC+ABS, PC/ABS from ABS PC Virgin Granules Fire Retardant V0 PC ABS Alloy Plastic Raw Material
Product Description | Applications | |||||
·Good dimensional stability | · Injection molding | |||||
· Excellent heat stability | ·Good mechanical properties balance | |||||
Properties | Test Method | Test Condition | Unit | Typical Values | ||
Specific Gravity | ISO 1183 | 23ºC | g/cm3 | 1.2 | ||
MI | ISO 1183 | g/10min | 25 | |||
Ash | ISO 3451 | 800ºC,30min | % | 0 | ||
Mechanical properties | ||||||
Tensile Strength | ISO 527 | 50mm/min | MPa | 53 | ||
(Yield) elongation | ISO 527 | 50mm/min | % | 60 | ||
Flexural Modulus | ISO 178 | 2mm/min | MPa | 2700 | ||
(3.18 mm) Cantilever beam notched impact strength | ASTM D256 | 23ºC | J/m | 50 | ||
(3.18 mm) Non-notched impact strength of cantilever beam | ASTM D256 | 23ºC | J/m | - | ||
Other properties | ||||||
Flammability | UL94 | 3.2 | HB | |||
Note: The data above is typical value for reference, not guarantee value. The data will vary with tool design such as gate type , gate location, gate number, injection molding process and part thickness. The data will vary with different color as well. Prior to use the material,please consult with TOPO NEW Material Co., Ltd. | ||||||
Processing Conditions | Range | |||||
Melt Temperature | 230-250ºC | |||||
Mold Temperature | 60-100ºC | |||||
Pre-Dry needed | 90ºC, 3-4h | |||||
Note: The above process condition is only for reference. The actual process should be adjusted according to different type of machine, mold design and product design. |
Are you trading company or manufacturer?
We are manufacturer.
About Sample?
5 KG Free Sample can be offered per your request.
About Material Color?
We can make the material to your appointed color according to Pantone/RAL#.
How does your factory control the quality?
Quality is the Priority, we always pay great important to quality from beginning to end, we have professional QC for item quality from spare parts to finished goods.
How many days for mass production?
20 days after all artwork and 30% deposit are confirmed.
How can I get the samples? is the sample free?
7-10 days to send free samples by DHL, TNT, UPS