China 600kw 750kw Continuous Running Load Bank with Copper Conductor UPS Test, Find details about China Dummy Load Bank, Load Bank from 600kw 750kw Continuous Running Load Bank with Copper Conductor UPS Test
Technical Parameters | |||||
Model | Installed Capacity | Power Factor | Load Voltage | Dimension | Weight(kg) |
W*D*H(mm) | |||||
AC400-20k | 21kw | 1 | 3 phase 400V 50HZ/60HZ | 480*485*680 | 30 |
AC400-100k | 110kw | 700*900*900 | 80 | ||
AC400-200k | 210kw | 1200*1500*1500 | 200 | ||
AC400-500k | 510kw | 1460*1980*1800 | 750 | ||
AC400-1000k | 1010kw | 1600*2400*2100 | 1500 | ||
AC400-2000k | 2010kw | 6058*2438*2591 | 5000 | ||
AC400-3000k | 3010kw | 7000 | |||
AC400-4400k | 4410kw | 8000 |