Product Overview
KAISEN Industrial Welding Fume Extractor With HEPT Filter Element
Main Features
1. Stand and direct-connected fan modularized design, the machine structure design is compact and reasonable.
2. Full-automatic cleaning system is easy to clean the dust on the surface of filter, it makes sure that the process of
manufacturing is high efficiency and continuity.
3. Siemens PLC smart control system is easy to be operated, it checks status of machine operating real time. Touch
screen operation supports multi-languages interface such as English, French and Russia.
4. The filter element is imported high quality polyester material, the surface of filter medium coated PTFE, it makes filter
cartridge high filtering precision and efficiency.
5. Adopting air spring device's lift to seal the dust bucket and hopper, it is easy to collect dust and move the dust bucket.
6. Smart control system is available of optional frequency converter and remote on/off linage device.
Applications
1. Large amounts of fume and dust
2. Laser, plasma and flame cutting systems
3. Multi-units welding station, grinding room
4. Welding school training center and robot welding lines
5. Workshop fumes and dust purification of Push-Push system
FEATURES AT A GLANCE
PRODUCT SPECIFICATIONS
Successful Project
PRODUCT CONFIGURATION
SIMILAR PRODUCTS
FAQ
1. Q: Do you have any certificate such as CE, RoHs, CSA?
A: We have different certificates for different products and different markets. Please feel free to
contact us for further information.2.Q: How long is the warranty period of your dust collector?
A: We provide free service (except filter)within 24 months and paid service for the whole working life
of the product
3. Q: Do you have installation guidance for export product?
A: We have standard installation guidance in English version and also we could provide other language
guidance.
4. Q: How long is the delivery time of goods ?
A: Generally the delivery time is 30 days, it needs to check with production and purchasing department if the machine is
not standard, we need to make CAD drawing according to the project requirement, totally the delivery time is within
60 days
Our Factory