Porous Base Mat Systemfinal Layers Consist of Two Coats of EPDM Rubber Structural Spraylife Expectancy 7-9 Years, with Maintenanceeco-Friendly Running Track

China Porous Base Mat Systemfinal Layers Consist of Two Coats of EPDM Rubber Structural Spraylife Expectancy 7-9 Years, with Maintenanceeco-Friendly Running Track, Find details and Price about China Paved-in-Place, Polyurethane from Porous Base Mat Systemfinal Layers Consist of Two Coats of EPDM Rubber Structural Spraylife Expectancy 7-9 Years, with Maintenanceeco-Friendly Running Track

Model NO.
rt6564661
Pattern
Sand
Color
Red, Blue, Green & 16 Colors
Installation Ways
Machine
Vertical Deformation
2.3mm
Usage
Outdoor, Indoor
Environmental Protection Level
E1
Durable Years
8-10 Years
Feature
Environmental Friendly
Material
Polyurethane
Function
Waterproof, Soundproof, Anti-Static, Thermal Insulation
Raw Material
Edpm, SBR, PU Binder
Application
School, Stadium, Playground
Sample
Free
Producing Ability
15 Days
Installation
Human Casting / Machine Spray
Trademark
Flyon
Transport Package
PU Material 200kg/Drum, EPDM/SBR Granules:25kg/Bag
Specification
200kg/drum; 25kg/bag
Origin
China
Model NO.
rt6564661
Pattern
Sand
Color
Red, Blue, Green & 16 Colors
Installation Ways
Machine
Vertical Deformation
2.3mm
Usage
Outdoor, Indoor
Environmental Protection Level
E1
Durable Years
8-10 Years
Feature
Environmental Friendly
Material
Polyurethane
Function
Waterproof, Soundproof, Anti-Static, Thermal Insulation
Raw Material
Edpm, SBR, PU Binder
Application
School, Stadium, Playground
Sample
Free
Producing Ability
15 Days
Installation
Human Casting / Machine Spray
Trademark
Flyon
Transport Package
PU Material 200kg/Drum, EPDM/SBR Granules:25kg/Bag
Specification
200kg/drum; 25kg/bag
Origin
China
NameSandwich System Running Track    
Base RequirementCement Concrete or Bituminous Concrete 
Thickness9-13mm
Suitable ScopeEDPM,SBR,PU Binder
MOQ500 Square Meter
Supply Ability1000Tons/Per Month
Delivery Times15days
Payment TermsT/T
PortGuangzhou 
  
  
  
  
Porous Base Mat Systemfinal Layers Consist of Two Coats of EPDM Rubber Structural Spraylife Expectancy 7-9 Years, with Maintenanceeco-Friendly Running Track

Porous Base Mat Systemfinal Layers Consist of Two Coats of EPDM Rubber Structural Spraylife Expectancy 7-9 Years, with Maintenanceeco-Friendly Running TrackPorous Base Mat Systemfinal Layers Consist of Two Coats of EPDM Rubber Structural Spraylife Expectancy 7-9 Years, with Maintenanceeco-Friendly Running TrackPorous Base Mat Systemfinal Layers Consist of Two Coats of EPDM Rubber Structural Spraylife Expectancy 7-9 Years, with Maintenanceeco-Friendly Running Track
Porous Base Mat Systemfinal Layers Consist of Two Coats of EPDM Rubber Structural Spraylife Expectancy 7-9 Years, with Maintenanceeco-Friendly Running TrackPorous Base Mat Systemfinal Layers Consist of Two Coats of EPDM Rubber Structural Spraylife Expectancy 7-9 Years, with Maintenanceeco-Friendly Running TrackPorous Base Mat Systemfinal Layers Consist of Two Coats of EPDM Rubber Structural Spraylife Expectancy 7-9 Years, with Maintenanceeco-Friendly Running Track
Porous Base Mat Systemfinal Layers Consist of Two Coats of EPDM Rubber Structural Spraylife Expectancy 7-9 Years, with Maintenanceeco-Friendly Running Track
Porous Base Mat Systemfinal Layers Consist of Two Coats of EPDM Rubber Structural Spraylife Expectancy 7-9 Years, with Maintenanceeco-Friendly Running Track
 

Project  Pictures


Porous Base Mat Systemfinal Layers Consist of Two Coats of EPDM Rubber Structural Spraylife Expectancy 7-9 Years, with Maintenanceeco-Friendly Running Track
Porous Base Mat Systemfinal Layers Consist of Two Coats of EPDM Rubber Structural Spraylife Expectancy 7-9 Years, with Maintenanceeco-Friendly Running Track
Porous Base Mat Systemfinal Layers Consist of Two Coats of EPDM Rubber Structural Spraylife Expectancy 7-9 Years, with Maintenanceeco-Friendly Running Track



 

Running Track Athletic Track 

 

The base layer consists of Black Styrene Butadiene Rubber(SBR) granules,bound together  with a specially formulated,  100% s olids  MDI  based  single  component polyurethane,at a thickness of 10mm(3/8inch).the top layer consists of a specially formulated, colored polyurethane into Ethylene Propylene Dience Monomer(EPDM) which  granules have been embedded before curing for a thickness of 3mm(1/8inch).

NameSandwich System Running Track    
Base RequirementCement Concrete or Bituminous Concrete 
Thickness9-13mm
Suitable ScopeEDPM,SBR,PU Binder

 Packaging & Shipping

MOQ500 Square Meter
Supply Ability1000Tons/Per Month
Delivery Times15days
Payment TermsT/T
PortGuangzhou 
FAQ
Q:What is the Production time?

 A:15-25days.

Q:What are the options for the base construction of a running track?

A:Based on asphalt or concrete.
 
Q:What is the life Span for Running track?

A:10-15years.

Q:How many system of Synthetic track surface,what is the best choice?

A: 4 system:Spray coat,Sandwich,Full pour and Prefabricate system.

 
Spray coating:Price competitive , permeable and surface paint by machine, more suitable for school or practice project
Sandwich sytem: EPDM broad be handwork,is professional than spray coat,most pouplar in the world market.
Full pour System: Best quality, bottom layer is PU with less sbr granules mix. Suitable for professional games and international school.
Prefabricate :Eco-friendly,package by roll, easy for installation,Professional for stadium international games,like Olympic games.