Environmental Plastic Material LED Lighting Emergency Light

China Environmental Plastic Material LED Lighting Emergency Light, Find details about China Lamp, LED Lamp from Environmental Plastic Material LED Lighting Emergency Light

Model NO.
AW-EL201
Charging Time
<24 Hours
Protection Level
IP30
Installation
Wall Mounted
Self-Test
Available
Certificate
Ce RoHS ISO9001 En14604
Trademark
Asenware
Transport Package
Carton
Specification
280mm*65mm*265mm
Origin
Zhongshan
HS Code
853110000
Model NO.
AW-EL201
Charging Time
<24 Hours
Protection Level
IP30
Installation
Wall Mounted
Self-Test
Available
Certificate
Ce RoHS ISO9001 En14604
Trademark
Asenware
Transport Package
Carton
Specification
280mm*65mm*265mm
Origin
Zhongshan
HS Code
853110000

Environmental Plastic Material LED Lighting Emergency Light

Environmental Plastic Material LED Lighting Emergency Light
Introduction:

Item nameTwin spot emergency light
Supply work voltage range110V-127VAC 50/60Hz; Or 220V-240VAC 50/60Hz
MaterialMetal
InstallationWall mounted
Product size280mm*65mm*265mm
Temperature-10~55ºC
Carton weight Approx 9 kg with 10pcs/carton
LampLED 1pcs/ spot, twin spot
BatteryNickel-cadmium Or Lead-acid
CustomizationLight source, Battery, Duration Time, Package, Control mode
Duration time60min, 90 min,120min,180min
StandardsISO9000 CE BS5266-7 IEC-60598-2-22

Packaging Details:
1) PEE bag per unit 
2) Outside Cartons
3)Strict & Standard Export Packing Procedures Adopted Exterior Corrugated Hardboard Carton Interior Blister Buffer Staff, Asenware fire pump control equipment.
Environmental Plastic Material LED Lighting Emergency Light

Our company
Asenware, manufacturer of fire alarm and fire suppression system since 2005. Our headquarter is in London, UK, with factory Shenzhen, China
We keep our best service for our customers, and have a rich experienced engineer team to design and install for overseas projects.

Product range
1. Addressable fire alarm system(FP100 series,2189,2100 series)
2. Conventional fire alarm system(2166 series)
3. FM200 gas fire suppression system
4. Emergency light system
5. Fire pump system
6. Fire hose and fire hose reel cabinet

Our Services
1.OEM / ODM services.
2.Professional technical team.
3.Offer Free technical support whenever you need
4.Two year warranty and technical maintenance

FAQ 
Q1: Are you manufacturer?
A: (yes)
Q2: What is the lead time?
A: usually
Fire control: one week working day
bulk quality: three weeks working days
Emergency lights: two weeks working days
bulk quality: four weeks
FM200:  two weeks working day
Fire pump: 25 days
Q3: How do you ship the goods and how long does it take arrive?
A: We usually ship by DHL, UPS, FedEx or by Air. 3-5 days after payment received.
Q4: Can I have a sample order?
A:Yes,we welcome sample order to test and check quality.
Q5: Do you offer OEM service?
A: Yes, we can design the things according to your request.