China Steel Bridge Viaduct Highway Railway Column Pier Steel Formwork, Find details about China Bridge Formwork, Steel Peri Formwork from Steel Bridge Viaduct Highway Railway Column Pier Steel Formwork
Bridge Formwork | ||
Item | Part name | Bridge Formwork |
1 | Material | Q235B,Q345,Q355 Steel |
2 | Design time | The time of design the fabrication drawings is 5 days. |
3 | Fabrication | The normally time is about 40 days. |
4 | Painting | Each formwork paint three times,a primer,a middle paint,a top paint.Prevent rust corrosion of formwork. |
5 | Delivery | LIANGGONG with a number of logistics to maintain long-term good relations of cooperation,to ensure the timely delivery of formworks to the port.LIANGGONG with a number of logistics to maintain long-term good relations of cooperation,to ensure the timely delivery of formworks to the port. |
6 | Installation on project site | LIANGGONG can arrange 1-2 enginner to provide technical support to the project site. |