China 15m Infrared Heating Long Bus Spray Booth/Drying Chamber, Find details about China Bus Spray Booth, Truck Paint Spray Booth from 15m Infrared Heating Long Bus Spray Booth/Drying Chamber
CPYE157501 | ||||
Outside Size(mm): | 15150×6500×5500mm(LxWxH) | |||
Inside Size(mm): | 15000×5000×5000mm(LxWxH) | |||
Front Door(mm): | 4000×4000mm(WxH), 1 Unit, galvanized steel cover frame, with polystyrene(EPS) inside. | |||
Service Door(mm): | 650×2000mm(W×H),2 Units, There are two sets of pressure lock which will automatically open when the pressure inside is over the limit. | |||
Total Power: | 58KW | |||
Cabin System | Wallboard | Double construction with insulations EPS, thickness 75mm, 0.5mm steel thickness, width:950mm, tongue and groove interlock structure, with Polystyrene(EPS) insulation inside. | ||
Basement | Need to build the base construction, 2 rows of pits in the ground for exhaust air, with galvanized grids made by twisted steel and flat bar above. | |||
Inlet Fan(Belt) | Capacity: 22500m³/h each | Outlet Fan(Belt) | Capacity: 22500m³/h each | |
Power: 7.5kw | Power: 7.5kw | |||
Quantity: 4 sets | Quantity: 2 sets | |||
Purification System | G3 grade, Air Inlet pre filter, EU5/F5 high efficiency filter (ceiling filter), G3 grade glass fiber floor filter, exhaust active carbon filter. | |||
Heating System | Italy Riello RG5S diesel burner, 260000Kcal/h, 2 sets | |||
Heating exchanger, stainless steel | ||||
max temp: 80 degree centigrade, heating time: 8-10 min(from 20 to 60)by Drying Phase | ||||
Lighting System | Ceiling Light: 18Units, each 4×36 W, with electronic ballasts; Side Light: 22Units, each 2×36W, with electronic ballasts | |||
Controlling System | Spraying, heat spraying, baking, time setting, lighting switch, failure indicator, thermostat, power supply switch, emergency stop, ampere meter, voltmeter, hour meter, temperature limit controller. | |||
Environmental System | G3 grade glass fiber floor filter, exhaust active carbon filter. |