Side panel 7′ or 8′ Used for Walk Through Frames Between

China Side panel 7′ or 8′ Used for Walk Through Frames Between, Find details about China Side panel, End panel from Side panel 7′ or 8′ Used for Walk Through Frames Between

Erection Position
External Scaffolding
Move Method
Attached Lifting Scaffolding
Scaffolding Part Type
Scaffolding Frames
Construction Properties
Building Scaffold
Surface Treatment
HDG, Powder Coated
Color
Customers′ Need
Wall Thickness
According to Customer′s Request
Usage
Frame System Scaffolding
Trademark
JCSF
Transport Package
Pallet
Specification
According to Customer′s specific requirments
Origin
Made in China
HS Code
73084000
Erection Position
External Scaffolding
Move Method
Attached Lifting Scaffolding
Scaffolding Part Type
Scaffolding Frames
Construction Properties
Building Scaffold
Surface Treatment
HDG, Powder Coated
Color
Customers′ Need
Wall Thickness
According to Customer′s Request
Usage
Frame System Scaffolding
Trademark
JCSF
Transport Package
Pallet
Specification
According to Customer′s specific requirments
Origin
Made in China
HS Code
73084000

We Chuzhou Jincheng Metalwork Co., Ltd, one of biggest manufactucturers of scaffoldings in China with 2 factories to make steel and aluminum seperately , all located in Chuzhou City, very close to Nanjing about 20 minutes, 1.5 hours to Shanghai Hongqiao Railway Statation. 

JCSF produces and sells a wide range of scaffoldings from year 2003, mainly focus on Ringlock, Cuplock, Kwikstage and Frame scaffolding system, as well as base jacks, steel plank, post shores, side brackets and other components. 

High quality, Reasonable prices and Time delivery are our key advantages, which enable us to get customers' trusts and support from all over the world, such as North/ South America, Austalia, New Zealand, even European countries. 

Frow 2 years ago, we started to produce aluminum ones by ourselves, such as aluminum frames, aluminumd decks, alumium stairs etc.


Side Pannel and End Pannel are used for walk through frames between. 

Side panel 7′ or 8′ Used for Walk Through Frames BetweenSide panel 7′ or 8′ Used for Walk Through Frames Between


Side panel 7′ or 8′ Used for Walk Through Frames Between

If they are anything we can do for you, please feel free to contact me, thank you.

Chuzhou Jincheng Metalwork Co., Ltd will be spare every effort to meet your demand.


Chuzhou Jincheng Metalwork Co., Ltd. we provide all full range of scaffolds to all clients from all over the world. Our business model is based on quality product at lowest prices, we are committed to 100% customer satisification through providing the highest quality product and surperior service at the lowest possible price.

Product Catalog

 - Ring Lock system ( verical, ledger, bay brace, truss ledger, steel plank, sidebracket, base collar, screw jack etc)

- Cup Lock System ( standard, ledger, bay brace, immdiate transom, plank, )

- Kwikstage scaffold( vertical, horizontal, diaganol brace, plank without hook etc) 

- Shoring Frame (6'x4', 4'x4' etc)

- Narrow Frame/ Walk through frame(6'4''x 5' ) & Mason frame, cross brace

- Post shore/ Sidework Bridge legs

- Steel plank (230mm/ 320mm width)


Factory Show

Side panel 7′ or 8′ Used for Walk Through Frames Between

Side panel 7′ or 8′ Used for Walk Through Frames BetweenSide panel 7′ or 8′ Used for Walk Through Frames Between
Side panel 7′ or 8′ Used for Walk Through Frames Between



Certificates Show

Side panel 7′ or 8′ Used for Walk Through Frames Between


Lab 

We have lab to do product testing for customers' requirements, such as loading bear capacity. 

Specially, we have a very large equipment to do test for scaffolding tower, sometime SGS or TUV come to factory to use this facility to do their own testing.

Side panel 7′ or 8′ Used for Walk Through Frames Between
Side panel 7′ or 8′ Used for Walk Through Frames Between
Side panel 7′ or 8′ Used for Walk Through Frames Between