China Big Size Laminating Glass Equipment Make The Smart Glass, Find details about China Smart Glass Laminated Oven, Glass Laminated Equipment from Big Size Laminating Glass Equipment Make The Smart Glass
Model | Processing glass size (mm) | Rated power | Operation system | N.W. | Outside dimonsion (mm) | Floor space (mm) | Production capacity (m2/cycle) |
FD-J-2-4 | 2000*3000*4 layers | 38kw | Siemens PLC | 3700kgs | 2530*4000*2150 | 3720*9000 | 72 |
FD-J-3-4 | 2200*3200*4 layers | 45kw | Siemens PLC | 3900kgs | 2730*4200*2150 | 4020*9500 | 84 |
FD-J-4-4 | 2200*3660*4layers | 52kw | Siemens PLC | 4100kgs | 2730*4600*2150 | 4020*10500 | 96 |
FD-J-5-4 | 2440*3660*4layers | 58kw | Siemens PLC | 4300kgs | 2965*4600*2150 | 4520*10500 | 107 |
Model | Processing glass size (mm) | Rated power | Operation system | N.W. | Outside dimonsion (mm) | Floor space (mm) | Production capacity (m2/cycle) |
FD-J-2-3 | 2000*3000*3 layers | 36kw | Siemens PLC | 3500kgs | 2530*4000*2120 | 3720*9000 | 54 |
FD-J-3-3 | 2200*3200*3 layers | 40kw | Siemens PLC | 3700kgs | 2730*4200*2120 | 4020*9500 | 63 |
FD-J-4-3 | 2200*3660*3layers | 46kw | Siemens PLC | 3800kgs | 2730*4600*2120 | 4020*10500 | 72 |
FD-J-5-3 | 2440*3660*3layers | 52kw | Siemens PLC | 4100kgs | 2965*4600*2120 | 4520*10500 | 80 |
Model | Processing glass size (mm) | Rated power | Operation system | N.W. | Outside dimonsion (mm) | Floor space (mm) | Production capacity (m2/cycle) |
FD-J-2-2 | 2000*3000*2 layers | 26kw | Siemens PLC | 2200kgs | 2600*4000*1150 | 3700*9000 | 36 |
FD-J-3-2 | 2200*3200*2 layers | 28kw | Siemens PLC | 2400kgs | 2750*4200*1150 | 4000*9500 | 42 |
FD-J-4-2 | 2200*3660*2layers | 30kw | Siemens PLC | 2500kgs | 2750*4600*1150 | 4000*10500 | 48 |
FD-J-5-2 | 2440*3660*2layers | 33kw | Siemens PLC | 2600kgs | 2980*4600*1150 | 4500*10500 | 53 |
work process | ||
1 | Equipment producing process | |
2 | Production quality control procedures | |
3 | Incoming inspection process storage | |
4 | Production process inspection process | |
5 | A laboratory inspection process | |
6 | Unqualified products processing | |
7 | After sale Service Process | |
Inspection standards (Level) | ||
1 | Storage test (failure is not warehousing) | |
2 | Standard operation (unqualified prohibition into the next step) | |
3 | Product testing standards (there are unqualified items prohibited the laboratory) |