Plastic Injection Mould for Bottle Cap

China Plastic Injection Mould for Bottle Cap, Find details about China Plastic Bottle Cap Mould, Plastic Bottle Cap Mold from Plastic Injection Mould for Bottle Cap

Model NO.
TZRM-BCM15002
Installation
Fixed
Standard
as Requirement
Customized
Customized
Name
Plastic Injection Mould for Bottle Cap
Mould Base
Lkm, Hasco Ect.
Mould Design
2D/3D Design
Injection System
Pin-Point-Gate
Polish System
Mirror Polish
Trademark
REMO
Specification
International
Origin
Taizhou China
HS Code
84807190
Model NO.
TZRM-BCM15002
Installation
Fixed
Standard
as Requirement
Customized
Customized
Name
Plastic Injection Mould for Bottle Cap
Mould Base
Lkm, Hasco Ect.
Mould Design
2D/3D Design
Injection System
Pin-Point-Gate
Polish System
Mirror Polish
Trademark
REMO
Specification
International
Origin
Taizhou China
HS Code
84807190
Plastic Injection Mould for Bottle Cap

REMO is one of plastic mould leaders in China. At REMO, we're committed to "Quality is life. Credit is core. Service is tenet". OVer the past 10 years, we've exported our moulds to more than 30 countries. Besides, we enjoy a good reputation in the mould industry.
The following information will help you understand our molds better.

Mould Material           45#, 50#, P20, H13, 718, 2738, Nak80, S136, SKD61
Cavity                           Single/multi
Runner                        Hot/cold
Design Days              3 days
Design Software       UG, PROE, CAD, CAE, CAM, CAXA ect
Plastic Material          PP, PC, PS, PE, PU, PVC, ABS, PMMA ect.
Mould Life                   600, 000-3, 000, 000 Shots
Payment                      40% of Deposit by T/T, 60% of Balance by T/T
Delivery Time              15-60 Days
                                                                                                        
Specification depends on customers' requirements.
Business Steps
1. R& DWe support customers' R& D. We'll make the  files or improve the design if you need

 
2. Quotation MakingMould Quotation will be finished in 1 day according to information we get.

 
3. NegotiationThe negotiation includes quality, price, material, delivery time, payment item, ect.

 
4. Mould DesignWe need to spend 3-5 days on mould and product 3D/2D drawing design

 
5. MouldWe will build the mould based on customers' requirements. Before making the mould, we'll send mould design to get customers' approval first. Mould will be usually completed in 25-60 days

 
6. Mould TestingWhen moulds are finished, we will test the moulds to check if they will satisfy consumers' needs. And we will send samples for consumers' reference.

 
7. Sample shootIf the first sample come out is not satisfied by customers, we will modify the mould until it can meet customers' needs.

 
8. DeliveryWe'll delivery goods either by sea or by air, according to customers' requirements.

Our advantages:

1; 10 years employees for commodity mould making
2; Over 500 commodity mould export every year
3; Over 10 countries of different commodity models
4; Excellent Cooling System with extended cooling pipe
5; Copper Cooling for better cooling effects
6; Pre-opening system to improve cycle time
7; Semi-Hot Runner System to save clients cost on moulds
8; Mould Available for recycle Material
9; Excellent control of polish system
10; Weekly report with mould processing photos available
11; Samples and each trial out video available
12; Punctual sample time and delivery time
13; Logistic service available
14; Engineers available in client's factory for training
15; High quality mould with reasonable price

WANT MORE DETAILS? WELCOME TO SEND US AN INQUIRY.