This Producing Process Sketch As Below Picture:This Profile Drawing As Below Picture: General Parameter
1 | Item | Parameters |
2 | Model NO. | YX51-332-996 |
3 | Material | Pre-painted galvanized sheet |
4 | Thickness | 0.65-1.2 mm |
5 | Yield Strength | 300 MPa |
6 | Feed Width | 1220 mm |
7 | Effective width | 1000mm |
8 | Roll Stages | 26 Stages |
9 | Shafts Diameter | ф95 mm |
10 | Main Motor Power | 18.5 KW |
11 | Hydraulic Group Power | 7.5 KW |
12 | Max. Line Speed Of Roll Former | Approx.25m/min |
13 | Electric Standard | According to local voltage |
Machine Components
A. 5Ton*1250mm Hydraulic un-coiler
Hydraulic system expand coil inner hole, Pump motor: 3KW
Frequency Inverter to regulate turning speed, Motor: 3KW
Link-connect expanding system
Load capacity = Max.5Tons
Coil Inner-diameter= 510±30mm, Coil width = Max.1250mm
Automatic stopping device with limited switch as assistance to control stop/start rotation B. Cold Rolling Mills
Feeding section with guide;
Gear/Sprocket driving;26 stages to formWall-plate frame design(Thickness change from 18mm to 25mm)Rollers manufactured from 45# steel,CNC lathes,hard chrome coating Shafts Diameter=ф95mm, Precision MachinedMain motor =18.5KW*2,Frequency speed controlMax line speed of roll former: Approx.25m/minProtection Mesh Cover (full mesh type) Above Roll-former To Avoid Hands Go InsideC. Hydraulic Cutting Device
Stop to cut, Post cut, Slug Breaker;
Cutting tool material : Cr12, Heat treatment;
Hydraulic group, Pump motor =7.5KW D. PLC Control SystemControl the quantity & cutting length automatically;
Combined with: PLC, Touch Screen, Inverter (SIEMENS), Encoder (Omron), REMOTE CONTROL etcCut-to-length tolerance≤±2 mm
Control Voltage 24VE. 6 METERS PNEUMATIC STACKING PALLET Stacking Length Max. 6 meters
Stacking length Min.2 meters
Pile up the sheet after cutting automatically.
Equipped with a bottom pallet to be pull out by motor driven
Support arm action in vertical direction, driven by pneumatic system
Action controlled by Pneumatic system.
The air supply provided by the user
After-Sale Service
In correct operation & maintaining, the machine is guaranteed for one year since leaving our factory excludes the electric elements.
Installation:
If installation is needed, WE will dispatch a technician to the buyer's factory abroad to assist regulating the machine with charge free. The buyer should assist US to get the Chinese technician's visa and should pay for the roundtrip air ticket and the local accommodation.
If installation is needed, the buyer shall make the following preparation before arrival of technicians.
Terms Of Trade
1.Package & Shipment: Facility water-proof packing, Control cabinet packed in wooden packing.
2.Payment: 30%payment by T/T is required as deposit within a week since the contract signing date.70% payment by T/T is required before the machine be send out of factory.