China High Quality Metal Steel Door Frame Roll Forming Making Machine, Find details about China Roll Forming Machine, Rolling Forming Machine from High Quality Metal Steel Door Frame Roll Forming Making Machine
Packing List
No. | Item | Unit | Qty |
1. | Decoiler | set | 1 |
2. | Main Roll Forming Machine | set | 1 |
3. | Cutting System | set | 1 |
4. | Oil Pump | set | 1 |
5. | PLC control Box | set | 1 |
6. | Output | set | 1 |
7. | Tools | box | 1 |
8. | Cooling system | set | 1 |
Machine Technical Specifications:
Main Forming machine | Forming steps | 14 station | |
Shaft diameter | 80mm | ||
Machine stand | H steel | ||
Machine frame | Steel plate welded | ||
Roller material | GB Cr15 with HRC56-58ºC, quenching and finishing | ||
Shaft material | 45# steel with quenching and tempering | ||
Work speed | 0-12m/min | ||
Transport | By Chains | ||
Power of main machine | 11.0kw | ||
Quantity | 1 set |
A Decoiler System
Type | Manual | Hydraulic |
Loading coil width | 1250/1450mm | 1250/1450mm |
Bearing | 5t | 5t/10t |
ID of coil | 450-550mm | 450-550mm |
Note | standard configuration | whether to bring loading car |
The Main Parts | Function |
a.two rows of rubber steel b.two sides of chains c.manual broach d.a set of rubber wheels | a protect material b.make it smooth c. save material d.press the material tight |
Stucture | Guide pillar/ arch/ Middle plate |
Be made of | rods\ roll shaft \ raking \ flying lifting eyes\ lifting holes rollers\ spacer \ blocks |
Our advantages | a. Thicker wall b. more stable framework |
Note | Gearbox drive more fluent |
Cuting type | Electric cut | Hydraulic cut |
Drive mode | electric motor | hydraulic station |
Stucture | channel steel guide pillar | channel steel guide pillar |
Apply to | too hot and too cold area | any area |
Type | Simple discharging table | Automatic stacker |
Length | usually 3metres long | any length can be customized |
Advantage | save space low cost | high-speed save time and labour |
Disadvantage | waste time and labour | high cost waste space |
Q1. What's your payment terms and delivery time?
A1: 30% deposit by T/T, 70% balance by T/T before shipment. Of course, L/C at sight is acceptable. The delivery time is about
30-45days after receipt of the deposit or L/C.
Q2. Can you provide some spare parts?
A2: Yes,the quick-wear parts will send you together with the machine.
Q3. Do you sell only standard machines?
A3: No, most of our machines were produced according to customers' specifications, we accept OEM.
Q4. What will you do if the machine is broken?
A4: Within the warranty(12 months),if the broken parts can't be repaired well, we can send you the new ones freely,
but you should pay the express cost. If it is beyond the warranty period, we can discuss how to solve the
problem perfectly, anyhow we offer the technical support for the whole life of the machine.
Q5. Can you be responsible for transport?
A5: Yes, please tell me the destination port or your address. we have rich experience in transportation.
Q6. How to visit your company?
A6: 1) Fly to Beijing airport, by high speed train From Beijing Nan to Cangzhou Xi railway station(1 hour);
2)or Fly to Shanghai Airport, by high speed train From Shanghai Hongqiao to Cangzhou Xi(4.5 hours),
...we would meet you at Cangzhou Xi railway station.