China All Kinds of Distribution Connector Wire End Electrical Terminal Block, Find details about China Terminal Block, Copper Block from All Kinds of Distribution Connector Wire End Electrical Terminal Block
Connection with or without ferrules
supplied with insulated back plate and transparent protective front cover,slef-exitingushing
960 mounting Methods.
fix on din-rail
on plate with 2 screws.
When installing under a front plate, a blanking plate can be clipped onto the front plate insulation
protectionon each bar.
Each bar can be labelled using cab 3tm
conform to siandard En60947-1
ICC;20KA PEAK
Item No. | Bus bar spec. | No of Bus bar | conductors with starfix temules | Cond.wout ferr. | Dimensions |
M8207 | 5*ø5.3mm/2*ø7.5mm | 2 | 1.5 to 6/ 6to16 | 2.5 to6/ 10 to25 | 65*42*50 |
M8211 | 7*ø5.3mm/2*ø7.5mm | 2 | 1.5to6 / 6to16 /10 to 16 | 2.5 to 6 /10to25 / 10to35 | 100*42*50 |
M8215 | 11*ø5.3mm/ 2*ø7.5mm | 2 | 1.5 to6 / 6to 16 / 10 to 16 | 2.5to6 /10to25 / 10to35 | 135*42*50 |
M8407 | 5*ø5.3mm/2*ø7.5mm | 4 | 1.5 to 6/ 6 to 16 | 2.5to6/ 10to25 | 65*85*50 |
M8411 | 7*ø5.3mm/2*ø7.5mm | 4 | 1.5 to 6 /6 to 16 / 10to 16 | 2.5 to6/ 10to25/ 10to 35 | 100*85*50 |
M8415 | 11*ø5.3mm/2*ø7.5mm | 4 | 1.5 to6 /6 to 16/ 10 to 16 | 2.5to6/ 10to25/ 10to35 | 135*85*50 |
FAQ:
1. How about sample and charge?
Sample is free, but freight cost, but will return freight cost to you when you place order.
2. Are you a trading company or a manufacturer?
We are a professional manufacturer for 10 years.
3.What about the payment?
30% deposit in advance, 70% balance againstcopy of B/L, by T/T, Cash or 100% LC at sight.
4. How long is the lead time?
Normally within 15-20 days after deposit received.
5.What's our normal Trade Terms?
EXW, FOB, CIF, CNF, DDU, L/C ect.
6.How to control your quality?
We have omplete quality guarantee system: IQC FAS &Self checking for
each producing progress →OQC. And as below:
1). Before production: sending pre-production samples for checking.
2). During production: sending mass production samples for checking again.
3). Before shipment: customers' or the third parties' visit to our factory to
check the quality directly or any inspection is welcome!
4). After shipment: if there is any problem of our goods due to our mistake,
we will surely be responsible for it.
7. How to guarantee punctual shipment for my order?
We give priority to export orders and keep updating progress from prod uction to delivery.
8. If we don't have shipping forwarder in China, would you do this for us?
Yes, we can offer you best shipping line to ensure you can get the goods timely at best price
9. How can we get detailed price list?
Please offer us detailed information of the product such as Size(length,
width,thickness),color,specific packaging requirements and purchasing quantity.