Xingdou Sc200/200 High Speed Double Cage Construction Building Hoist

China Xingdou Sc200/200 High Speed Double Cage Construction Building Hoist, Find details about China Construction /Building Hoist/ Lifting from Xingdou Sc200/200 High Speed Double Cage Construction Building Hoist

Model NO.
SC200/200 SC150/150 SC100/100 SC50/50
Lift Mechanism
Rack and Gear
Attendant
Without Attendant
Deceleration Device
With Deceleration Device
Elevator Door
Straight Fractional Door
Trademark
XINGDOU
Transport Package
Packing
Specification
650*650*1508mm 650*900*1508mm
Origin
China
HS Code
8428109000
Model NO.
SC200/200 SC150/150 SC100/100 SC50/50
Lift Mechanism
Rack and Gear
Attendant
Without Attendant
Deceleration Device
With Deceleration Device
Elevator Door
Straight Fractional Door
Trademark
XINGDOU
Transport Package
Packing
Specification
650*650*1508mm 650*900*1508mm
Origin
China
HS Code
8428109000
Product Description

 

XINGDOU SC200/200 High Speed  Double Cage Construction Building Hoist 
 

1. Description

Construction hoist is also called building construction elevator, outdoor elevator, building lifts. It is widely used as construction machinery to lift people and building materials.

Construction hoist is mainly used in the internal and external decoration, bridge building, chimney, etc

SC series Construction Hoist/Elevators adopts rack-and-pinion transmission. For so many years, having digested domestic and foreign advanced technology and innovated, it has become newly designed, compact structure, convenient operation, easy installation and disassembly, beautiful shape and reliable performance.

> Mast Section Dimension: 650 * 650 * 1508, 800 * 800 * 1508

> Main Chord: Φ76 * 4.5, Φ76 * 6.0, Q345B

Structure forms varies: SCD two drive, SC three drive without balance, built-in upper-setting and frequency control, etc.

Application: the equipment is applicable to people and material transporting in high building construction that above 60m, such as bridges, chimneys, mansions, etc.. And can also be used in warehouse , wharf, etc for vertical transportation

Color:  red

Dimension of mast section  650*650*1508mm

Mass of mast section  150kg

Mass of external cages  1480kg

Space dimension in cage 3.2*1.5*2.5m
Xingdou Sc200/200 High Speed Double Cage Construction Building Hoist

Xingdou Sc200/200 High Speed Double Cage Construction Building Hoist

 

2.Main Technical Parameters

Parameter

Unit

Model

SC100

SC100/100

SC200

SC200/200

Rated capacity

kg

1000

2×1000

2000

2×2000

Number of people

No.

12

2×12

16

2×16

Rated lifting speed

m/min

36

36

36

36

Max.lifting height

m

200

200

200

200

Motor power

kw

2×11

2×2×11

3×11

2×3×11

Suspension cage inner size

m

3×1.3×2.2

3×1.3×2.2

3×1.3×2.2

3×1.3×2.2

Weight of 650 standard section

kg

124

148

124

148

Dimension of 650 standard section

mm

650×650×1508

650×650×1508

650×650×1508

650×650×1508

counter weight

kg

=

=

=

=

Suspender loading capacity

kg

200

200

200

200

Dimension of 800 standard section

mm

800×800×1508

800×800×1508

800×800×1508

800×800×1508 

Xingdou Sc200/200 High Speed Double Cage Construction Building Hoist

3.Salient Features of Construction Elevator

  1. Mast section welded by welding Robot ensures reliable quality and elegant appearance.
  2. All the steel structures are processed with blasting technology to remove rust. The adhesion of surface painting is outstanding.
  3. Suspension cage guarding board adopts figured aluminum plate and numerical control punched aluminum plate. The suspension cage is lightweight and artistic in appearance.
  4. Transmission mechanism supplied by the professional manufacturer has high efficiency, long service life and stability in performance.
  5. Complete set of overload protection devices, variety of limiters and mechanical chain devices ensure its reliability. Anti-falling safety device adopts SAJ40-1.2, which restricts the excessive downward movement of the cage, preventing and eliminating accidents.
  6. Frequency conversional construction elevator is safe, stable and comfortable. Starting electricity is smaller than working electricity, energy-saving and high efficient.
Xingdou Sc200/200 High Speed Double Cage Construction Building Hoist

4. FAQ

        1 .Q: Are you factory?

            A: Yes, we are a factory that located in Nanjing for over 10 years

        2.Q:what is the delivery time?

              A: It is according to the machine you need.

        3.Q: How is the machine packed?

              A: Each packed in carton, then put in wooden case, and then in container.

        4.Q:Why choose us?

              A: We own high-quality, reasonable price. If purchase now,

             we will supply you one set assembly auxiliary tools and one set wearing parts.

         5.Q:Can we visiting your factory?

              A: We warmly welcome your visiting!