China Easy Install Steel Structure Sheds Prefabricated Steel Warehouse Buildings, Find details about China Steel Structure, Steel Building from Easy Install Steel Structure Sheds Prefabricated Steel Warehouse Buildings
Item Name | Materials Characteristics | Material Grade | Surface Treatment |
Steel Column | H shape,Box,Steel Pipe,Hot rolled sheet | Q235B,Q345B | Paint or Hot dip Galvanized |
Steel beam | H shape,Box,Steel Pipe,Hot rolled sheet | Q235B,Q345B | Paint or Hot dip Galvanized |
Steel Bracing | Steel Rod,Steel Pipe,Angle Steel | Q235B,Q345B | Paint or Hot dip Galvanized |
Steel Purlin | C or Z purlins(Thickness1.8mm~3.0mm) | Q235B,Q345B | Hot dip Galvanized |
External Wall panels,Roof panels | Single colorful corrugate steel sheet,sandwich panels with EPS,Rock wool,PU. | Galvanized Steel+Painting | Alu-zin 150g,Fluorocarbon pain |
Steel buildings Door | Slidding or Rolling door | Steel or Aluminum sheet | Paint or Hot dip galvanized |
Steel buildings Windows | Aluminum alloy-Glass,Aluminum alloy-shutter | T=1.0-2.0mm | Alloy |
Skylighting panels | FRP T=1.5mm-1.8mm | Coefficient of thermal expansion:2.2x10-5/cm | Light Tranmitar 85% |
Ventilator | Turbine ventilator on a ridge | Steel,Stainless steel ,PC | Paint or Hot dip Galvanized |
Gutter | Galvanized steel plate,Stainless steel plate | T=2.0mm | Hot dip galvanized |
Downpipe | PVC pipe,color steel pipe Y=0.5mm | Dia110mm | paint |
Hight Bolt | Ordinary ,High strength | 10.9S,4.8S | Hot dip galvanized,Steel |
Ground bolts | Steel RodM24,M27,M30,M33,M39,M42 | 10.9S | Steel |
Our goal is not only to provide high quality steel structure building, but also to maintain a personalized and professional relationship with
each customer. No matter how big or small your requirement we will do our best to meet your demand. One stop service from design,
manufacture, deliver to installation and after-service.
1.We can manufacture strictly accordingto your drawings and request.
2.We can design ourself to supply you a most suitable proposal to you.
1.The industry's leading plasma slitting machine solves the defects of traditional flame cutting burrs; | |
2.Brand new high-strength steel plate with the material of certificate from first class steel mill , never use rusted stock; | |
3.Flexible design of welded H-beam, can process various models, fully save costs, 0 waste; | |
4.Welded H-beam double-sided for continuous full penetration submerged arc welding, which is as strong as hot-rolled H beam and the design is diversified; | |
5.The 3D drilling machine drill the web and flange hole in one time, which greatly improves the accuracy of the hole making compared with the magnetic drill;
| |
7.Our own hot-dip galvanizing zinc pot size 12.5*1.8*1.5m, annual productivity 100,000 tons. |
1. The overall optimized roofing system stabilizes the main frame structure. A Reduce the use of bracing bar. B Compared with other manufacturers normally use more than 4 models of the purlins, we just use 2 models optimized purlins on our steel structures, which saves much shipping space and processing cost. | |
(2) All the Purlin cleats and main steel structure bolts are versatile, which not only makes it more easier for installation, but also save a lot of shipping space. | |
(3) The use of our new model Purlin cleat bans the traditional (welding cleat on the beam&column), which avoids the bending after the collision and saves much space during transportation. | |
(4) We have the exclusive patent on rigid support, which replaces the flexible support brace. Our rigid support makes the entire roofing system more stable while saving Knee-Brace compared with traditional steel structure. | |
(5) The built-in galvanized gutter replaces the external gutter, which has good waterproof effect and promotes the roof system to be more stable while replacing the tie rod. It is more stable and cost effective, what's more the appearance of the entire house is much better. | |
(6) Our Sliding Door, we use single sliding door to replace double sliding door on normal steel structure. |
Installation
Our new type steel structure is more convenient to install, 2,000 square meters can be completed within 1 week by 5 workers.
1) The main steel frames(structure) are all connected by high-strength bolts, no need on-site welding. Its' installation is similar to building blocks.
(2) Totally 2 types of purlins will be used on roof and the walls of our Steel Structure. (there are at least 4 types of purlins will be used on the roofing and walls by other manufacturers.) So it can be constructed more easily without further distinction.
(3) The combination of Chemical bolt and chemical glue bans the complex steel cage foundation structure in traditional steel structures, making on-site construction more convenient. The columns are easier to align so that the steel structures are at the same level.
(4) The architectural installation drawings are easier to understand and can be installed in conjunction with theinstallation video, reducing the cost of assignments.
Extension
All our steel-structured houses can be extended on the original frame.
(1) The holes are reserved on the column of our steel structures, and the way of bolt connection makes the expansion more convenient in future.
(2) The installation and location of the our roofing purlins make expansion and construction easier in future.