China ASTM A36 Steel Pipe 20 Inch 24 Inch 30 Inch Seamless Carbon Steel Pipe Stainless Steel Pipe Tube Building Material Steel Tube, Find details about China Carbon Steel Pipe, A53 Carbon Seamless Steel Pipe from ASTM A36 Steel Pipe 20 Inch 24 Inch 30 Inch Seamless Carbon Steel Pipe Stainless Steel Pipe Tube Building Material Steel Tube
Products | ASTM A106/ API 5L / ASTM A53 A36 Grade B Seamless Steel Pipe for Oil and Gas Pipeline |
Material | Q195, Q235, Q345; ASTM A53 GrA,GrB; STKM11,ST37,ST52, 16Mn,etc. |
Wall Thickness | 0.7MM~30MM |
Length | Length:Single random length/Double random length 5m-14m,5.8m,6m,10m-12m,12m or as customer's actual reques |
Standard | JIS G3466, EN 10219, GB/T 3094-2000, GB/T 6728-2002 |
Grade | Grade A, Grade B, Grade C |
Section Shape | Square, Rectangular, Round, |
Technique | Seamless Steel Pipe |
Packing | Bundle, or with all kinds of colors PVC or as your requirements |
Ends | Plain end/Beveled,protected by plastic caps on both ends, cut quare,grooved,threaded and coupling,etc. |
MOQ | 1 Tons, more quantity price will be lower |
Surface Treatment | 1. Galvanized 2. PVC,Black and color painting 3. Transparent oil,anti-rust oil 4. According to clients requirement |
Product Application | 1. Fence, greenhouse, door pipe,greenhouse 2. Low pressure liquid, water, gas, oil, line pipe 3. For both indoor and outdoor the building construction 4. Widely used in scaffolding construction which is much cheaper and convenient |
Origin | Tianjin OF China |
Certificates | API ISO9001-2008,SGS.BV |
Delivery Time | Usually within 10-45 days after receipt of advance payment |
FAQ
Q1: What is your terms of payment?
A: 30% T/T in advance, the balance 70% before delivery. We will show you the photos of products and package before you pay the balance.
Q2: what is the terms of delivery?
A: EXW, FOB, CIF, CFR, DDU
Q3: What is the terms of packing?
A: generally, we pack our goods in bundles or coils with rods or belts, we could also pack the goods as the customers' requirement.
Q4: What is your delivery time?
A: For stocks, we could transport the goods to loading port within 7 days after we received your deposit.
For production period, it usually takes about 15 days-30 days after receiving the deposit.
Q5: Could you produce according to the samples?
A : Yes, we could customer-made by your samples or technique drawings, we could build the mold and fixtures.
Q6: Could you provide the samples?
A: yes, we could provide the free samples on conditons it is available in stocks, however, the the transportation fee is borne by buyer.
Q7: How could you guarantee your products?
A: Each piece of products is manufactured by certified workshops, inspected by Lenser piece by piece according to national QA/QC standard. We also could issue the warranty to customer to guarantee the quality.