Hydro Power Regulator Hydro Turbine Generator

China Hydro Power Regulator Hydro Turbine Generator, Find details about China Hydro Power Regulator, Hydro Regulators from Hydro Power Regulator Hydro Turbine Generator

Model NO.
CJA237/475-W
Standard
Standard
Net Head
260m-500m
Flow Rate
0.25-0.8m3/S
Rated Rotating Speed
600r/Min
Efficiency of Turbine
89.5%
Efficiency of Generator
93.5%
Governor
High Hydraulic Microcomputer
Valve
Butterfly Valve / Gate Valve
Excitation Device
5 in 1 Integrated Control Panel
Keyword
Pelton Turbine
Trademark
Forster
Transport Package
Wood Box
Specification
15-30 cubic
Origin
China
HS Code
8502390010
Model NO.
CJA237/475-W
Standard
Standard
Net Head
260m-500m
Flow Rate
0.25-0.8m3/S
Rated Rotating Speed
600r/Min
Efficiency of Turbine
89.5%
Efficiency of Generator
93.5%
Governor
High Hydraulic Microcomputer
Valve
Butterfly Valve / Gate Valve
Excitation Device
5 in 1 Integrated Control Panel
Keyword
Pelton Turbine
Trademark
Forster
Transport Package
Wood Box
Specification
15-30 cubic
Origin
China
HS Code
8502390010

Hydro Power Regulator Hydro Turbine Generator

Our main products included:

1.Kaplan turbine generators series.

2.Turgo turbine generators series,e.g. vertical type horizontal type.

3.Tubular turbine generators series ,e.g. Bulb type and shaft extension type.

4. Francis turbine generators series.

5.Pelton turbine generators series and double turbine generators series and so on.

6.Other auxiliary equipment for hydropower station, such as generator, control panel, governor, valve, transformer, automatic electrical equipment, electricity meter, pressure tube, etc
Hydro Power Regulator Hydro Turbine Generator

Product features:                          

1.suitable for high head,small flow and flow changes in large runoff hydropower station.

2.With the power plant investment is small,compact units structure characteristics.

3.Has the efficiency changes smoothly,operating a wide range,even in the 15--20% load is reduced efficiency.

4.Suitable for high head,small flow station in mountainous area.

5.A unit construction,simple restrictions without cavitation condition,the advantages of stable operation,less investment,construction area.

Product parameters:
 Pelton tubine generator unitGeneratorUnit output (kw)Gevernor or Regulating workValve
Turbine
CJA237/475-W-90/1 x 111000.4333500SFW320-12/990320 BWT-6000 CJWT- IDN400
1200.44455SFW400-12/990400 
1400.478566SFW500-12/990500520.7
1600.511699600SFW630-10/1180630643.1
1800.542836SFW800-10/1180800769.1
2000.572939SFW700-10/1180800863.9
2400.61097750SFW1000-8/118010001020.2
2600.6261275SFW1250-8/143012501192.1
2800.6521451SFW1250-8/143012501356.7
CJA237/475-W-100/1 x111800.536804500SFW800-12/1430800739.6CJWT- 1 BWT-6000DN400
2000.565953600SFW800-10/1180800876.7
2200.5931112SFW1000-10/143010001023
2400.621262SFW1000-10/143010001161
2600.6451406SFW1250-10/143012501293
2800.6691561750SFW1250-10/143012501436
3000.6931733SFW1600-10/143016001594
3200.7151930SFW1600-10/143016001775
3400.7372138SFW2000-10/173020001966
3600.7582315SFW2000-10/173020002129
3800.7792497SFW2000-10/173020002297

Product pictures:

Hydro Power Regulator Hydro Turbine Generator
Hydro Power Regulator Hydro Turbine Generator

Hydro Power Regulator Hydro Turbine Generator
Hydro Power Regulator Hydro Turbine Generator
Installation picture:

Hydro Power Regulator Hydro Turbine Generator

Company Information

Hydro Power Regulator Hydro Turbine Generator

Our workshop

Hydro Power Regulator Hydro Turbine Generator

Advantages

Hydro Power Regulator Hydro Turbine Generator
 


Engineering Case

Hydro Power Regulator Hydro Turbine Generator


Packaging & Shipping

Hydro Power Regulator Hydro Turbine Generator


FAQ

Q1, Which turbine should I choose?

 Please tell me the water head, flow rate, frequency, Total power you need

, voltage, on grid or off grid operation, we will propose a solution.

Q2, Can your factory provide all the equipment for hydropower generation?

Yes, we can provide you with turbines, hydro-generators, pressure regulators, turbine wheels, control panels, transformers, monitoring systems and more.

Q3, Can you do EPC for a hydroelectric power plant?

Yes, we can provide TURN-KEY and EPC services including measurement, design, manufacturing, construction, manufacturing, commissioning, inspection, maintenance runner replacement and refurbishment/upgrade/improvement/repair/refurbishment of turbines/generators including bearings, seals For parts and key parts, we will send technicians and workers to install equipment.

Q4,Is your company a trading company or a manufacturer?

We are a manufacturer of hydro turbine generators and started to promote the international market in 2013. Our factory is located in Sichuan, where China's water conservancy and hydropower is most developed. Welcome to visit our factory in China.

Q5, What is an acceptable MOQ?

 For this product, our acceptable MOQ is 1 set.

Q6,How long is the delivery time?

Delivery times range from 15 days to 6 months depending on the model you are purchasing.

Q7,Does your company have its own independent official website?

Of course, and we can see more information about our company and products on our official website.   

website address: cdforster.en.made-in-china.com

Hydro Power Regulator Hydro Turbine Generator