China Automatic OPP Hot Melt Glue Labeling Machine for Round Bottle, Find details about China Label Machine, Labeler from Automatic OPP Hot Melt Glue Labeling Machine for Round Bottle
Mechanical parks:
- Transportation institution: TRANSTECNO AC motor 750W (with deceleration by TRANSTECNO), inverter speed controlPower supply | Three-phase 380V 50 Hz 8000W |
The total length of equipment | 3000mm(conveyor length 3000mm or can be regulate base on your product lines) |
Equipment width | 2000mm |
Conveyor speed | 35m/min (the speed of the transmission lines can be adjusted according to actual production) |
The method of speed adjustment | uninterrupted - adjust rate |
The largest Speed of labels feed | maximum speed of 100 meters labels / min |
The largest speed of labeling | 10000 pcs/H |
Labeling accuracy | ± 1mm |
Integrated Labeling accuracy | ± 1mm |
Product Size: base on client supply container | 2L Φ 100mm |
Maximum label width | 160mm |
The maximum length of label | 500mm |
The maximum diameter of label | 500mm |
Paper core diameter | 152 mm |
Labeling glue | leading and trailing edge gluing with hot melt |
Gluing temperature | 120~160C |
Type of label | opp label, paper-plastic composite film label, paper label |
Labeling workstation | 12 per cycle |
The quantity of labeling mold | 1 set |
Machine weight | 2000 Kg |
Packaging & Shipping:
FAQ:
Q1: which city are you in? how can I get to your factory? Are you a trading company or factory?
A1: We are in Zhangjiagang city, two hours driving from Shanghai. We are factory. Manufacturing mainly beverage filling and packagingmachines. We offer turnkey solutions with more than 10 years experience.
Q2: Why is your prices higher than others?
A2: We offer high-end machines in our business. Welcome to our factory to have a visit. And you will see the difference.
Q3: What is your delivery time?
A3: Normally 30-60 working days depends one machines, water machines are faster, carbonated drink machines are slower.
Q4: How to install my machines when it arrives? How much the cost?
A4: We will send our engineers to your factory to install the machines and train your staff how to operate the machines If needed. Or you can arrange engineers to study in our factory. You are responsible for air tickets, accommodation and our engineer wage USD100/day/person.
Q5: How long time for installation?
A5: Subject to machines and the situation in your factory. If everything is ready, it will take about 10 days to 25 days.
Q6: How about the spare parts?
A6: We will send one year enough easy broken spare parts together with the machines for free, we suggest you buy more units to save international courier such as DHL, it is really costly.
Q7: What is your guarantee?
A7: We have one year guarantee and life-long technical support. Our service also including machine maintence.
Q8: What is your payment term?
A8: 30%T/T in advance as down payment, rest should be paid before shipping. L/C is supported also.