Factory Directly Supply Three Wheel Tricycle Tyre/Rikshaw Tyre/Tuk Tuk Tyre/ Motorcycle Tyre Mould

China Factory Directly Supply Three Wheel Tricycle Tyre/Rikshaw Tyre/Tuk Tuk Tyre/ Motorcycle Tyre Mould, Find details about China Tricycle Tyre Mould, Tire Mould from Factory Directly Supply Three Wheel Tricycle Tyre/Rikshaw Tyre/Tuk Tuk Tyre/ Motorcycle Tyre Mould

Model NO.
4.00-8
Certification
ISO9001:2008,SGS
Mould Life
500000-1000000 times
Warranty
1 Year
Customized
Customized
Material
Cast Steel
Tyre Pattern
EDM Processing
Sidewall Letters
CNC Engraving
Shipment Terms
Fob;CFR:CIF
Mould Drawing
Can Design Mould Drawing as Per Your Dimension
Mould Inside
with Anti-Rust Oil
Mould Outside
with Paint
Packing
in Plywood Cartons, No Need Fumigation
Trademark
OEM ODM
Transport Package
in Plywood Cases
Specification
4.00-8
Origin
China
Model NO.
4.00-8
Certification
ISO9001:2008,SGS
Mould Life
500000-1000000 times
Warranty
1 Year
Customized
Customized
Material
Cast Steel
Tyre Pattern
EDM Processing
Sidewall Letters
CNC Engraving
Shipment Terms
Fob;CFR:CIF
Mould Drawing
Can Design Mould Drawing as Per Your Dimension
Mould Inside
with Anti-Rust Oil
Mould Outside
with Paint
Packing
in Plywood Cartons, No Need Fumigation
Trademark
OEM ODM
Transport Package
in Plywood Cases
Specification
4.00-8
Origin
China

Factory Directly Supply Three Wheel Tricycle Tyre/Rikshaw Tyre/Tuk Tuk Tyre/ Motorcycle Tyre Mould

Factory Directly Supply Three Wheel Tricycle Tyre/Rikshaw Tyre/Tuk Tuk Tyre/ Motorcycle Tyre 4.00-8 Mould
Specification

Materialforged steel/cast steel
Main businesstire molds
tube molds
airbag molds
flap molds
bladder moulds
Production ability300sets/month
Customized We accept OEM/ODM. You can provide us tyre sample or reference drawing.
SoftwareAutoCAD, Pro-E, UG, CAXA, etc.
EquipmentLathe/ cnc lathe/ Taiwan BEST EDM/ carving machine/ engraving machine/ cnc wire-cut machine/ radial drilling machine/ milling machine/ tapping machine/ grinding machine etc.
Quality ControlFollowing the quality systems ISO9001:2008, Zhenyao mould takes quality controls step by step, from design audit, incoming material checking, inspection at each process, to FAI inspection, final verification of molds & parts.
Design Time3-7days
Delivery Timeit generally requires 35 to 40 days after getting down-payment bills for molds to be made, supposing the 3D files are accurate.
Payment termTT, L/C, Cash...
ContactsQingdao Zhenyao Mould Co.,Ltd
Contact: Sherry Zhang
Mobile:+86 15054218539 

Factory Directly Supply Three Wheel Tricycle Tyre/Rikshaw Tyre/Tuk Tuk Tyre/ Motorcycle Tyre Mould
Factory Directly Supply Three Wheel Tricycle Tyre/Rikshaw Tyre/Tuk Tuk Tyre/ Motorcycle Tyre Mould
Factory Directly Supply Three Wheel Tricycle Tyre/Rikshaw Tyre/Tuk Tuk Tyre/ Motorcycle Tyre Mould
Factory Directly Supply Three Wheel Tricycle Tyre/Rikshaw Tyre/Tuk Tuk Tyre/ Motorcycle Tyre Mould
Factory Directly Supply Three Wheel Tricycle Tyre/Rikshaw Tyre/Tuk Tuk Tyre/ Motorcycle Tyre Mould

Product Packing

Factory Directly Supply Three Wheel Tricycle Tyre/Rikshaw Tyre/Tuk Tuk Tyre/ Motorcycle Tyre Mould

Our Advantage
1.Competitive price.
2.Continuance service and support.
3.Diversified rich experienced skilled workers.
4.OEM & ODM accepted.
5.Satisfaction,precision and trust.

Customers assistance for initial detail quotation on moulds.
(1).Sample or 2D/3D Design drawings offered.
(2).If there is no sample or drawing, please advise the important dimensions/photos.
(3).Material information.
(4).Level and quantity information if possible.
 

Factory Directly Supply Three Wheel Tricycle Tyre/Rikshaw Tyre/Tuk Tuk Tyre/ Motorcycle Tyre Mould

Company Introduction

Qingdao Zhenyao (Zhenjie) Mould Co.,Ltd was founded in 1990 , locates in Qingdao - a beautiful coastal and industrial city in China , has developed into a high-tech private enterprise from design to manufacture all kinds of tire molds.The company covers 20,000 square meters , has a building area of 10,000 square meters , with total assets of more than 30 million RMB.

So far , the company has 80 employees , among which have 26 engineers and 10 quality inspectors.We own 60 set equipments ,including 30 sets Taiwan BEST EDM , CNC , processing center , etc.

We are specialized in tire mould making ,including TBR tire mould , PCR tire mould , solid tire mould , agricultural & OTR tire mould , light truck tire mould , ATV&turf /lawn tire mould,motorcycle &bicycle tire mould , inner tube mould ,etc.

Our products play a leading role in domestic market and have been exported to many countries and regions , such as Taiwan , America , Italy , Germany ,India ,Turkey , Southeast Asia , etc.

Our company adopts the advanced technology of CNC and EDM machine to ensure high quality , has passed ISO 9001 - 2000 international quality management system certification , and has been appraised many times as a contract respecting and credit standing enterprise.We always regard the customer as the center , insist on management idea of "dedication , innovation , integrity , efficient",treat the quality as life , will go on devoting ourselves to provide better products and service to customers.

Factory Directly Supply Three Wheel Tricycle Tyre/Rikshaw Tyre/Tuk Tuk Tyre/ Motorcycle Tyre MouldFactory Directly Supply Three Wheel Tricycle Tyre/Rikshaw Tyre/Tuk Tuk Tyre/ Motorcycle Tyre MouldFactory Directly Supply Three Wheel Tricycle Tyre/Rikshaw Tyre/Tuk Tuk Tyre/ Motorcycle Tyre Mould
FAQ:

Q: Are you a factory or trading company? 
A: We are factory, established in year of 1996.

Q:How does your factory do regarding quality control? 
A: Quality is priority. We always attach great importance to quality controlling from the very beginning to
the end. All the moulds, the QC measure with corresponding measuring equipments regularly .

Q:What Certification will be guaranteed of your quality and services?
A: We obtained the ISO9001:2008 certification and SGS audited.

Q: Generally, how much do you export proportion in your product? Main country?
A: About 20%, main export country in India, Bangladesh,Pakistan,Indonesia,Brasil,Denmark,Iran etc.

Q: Which kind information need for quotation?
A: Sample photo with size or 2D/3D design.

Q: What is the delivery time?
A: 3-7 days for mould design, 35-45 days for mould production after deposit payment and mould design confirmed.

Q: How about the payment terms?
A: TT, L/C,Cash etc.

Q: Why choose us?
A: We have professional team with rich experiences and high precision equipments which can guarantee the product quality, through our scientific management and strict cost control we can offer you the best competitive price. 
 
For more information, pls don't hesitate to contact us & we are prepared to be challenged, looking forward to get involved in your next project!