YX300 COLD ROLLING MILLS FOR RIDGE CAP
Material: Material thickness: 0.4~0.6mmEffective width: 373.7±5 mmFeeding width: 470mmPre-painted coil, Yield strength: 550MpaMachine Componentsa. 3TonX600mm Hydraulic Un-CoilerHydraulic system for expansion coil-inner-hole with 4 palms;Link-connect expanding systemPump power=1.5KW;Drag off turning typeLoad capacity=3 Ton;Coil Inner - diameter =451-530 mmCoil outer-diameter=Max. 1500 mmCoiler Width=Max. 600 mm
b. Entry Bench & Manual Pre-shearing device (Un-powered) Smart cut control, to cut off the end of the final piece of sheet onlyWorking thickness up to 0.8mmc. Cold Rolling MillsFeeding section with guide; Wall plate frame designGear/Sprocket driving;14-step to formRollers manufactured from 45 # steel, CNC lathes, hard Chrome CoatedShafts Diameter=ф75mm, Precision MachinedMain motor =5.5 KW, Frequency speed controlMax line forming speed for roll former:15m/minProtection Mesh Cover (full mesh type) Above Roll-former To Avoid Hands Go Inside
d.Hydraulic Cutting DeviceStop to cut, No Blanking cutPump motor =4KWCutting tool material: Cr12, Heat treatment
e. PLC Control SystemControl the quantity & cutting length automatically.Combined with: PLC, Touch Screen (Siemens), Inverter(Schneider), Encoder (Omron), etc Cut-to-length tolerance≤±2.0 mmControl voltage 24VProduct Rack Un-powered, 3 units
After-Sale Service
In correct operation & maintaining, the machine is guaranteed for one year since leaving our factory excludes the electric elements.
Installation:
If installation is needed, WE will dispatch a technician to the buyer's factory abroad to assist regulating the machine with charge free.
The buyer should assist US to get the Chinese technician's visa and should pay for the roundtrip air ticket and the local accommodation.
If installation is needed, the buyer shall make the following preparation before arrival of technicians.
Terms Of Trade
Package & Shipment: Facility water-proof packing, Control cabinet packed in wooden packing.
Payment: 30%payment by T/T is required as deposit within a week since the contract signing date.70% payment by T/T is required
before the machine be send out of factory.