W Beam Traffic Barrier Crash Guardrails Roll Forming Machine
Drawing :
Equipment configuration
Manual Feeding device (3 T capacity), transmission, flattening device, before-punching device (2 sets), main machine and roller (including guide table), cutting (after roll forming) device, hydraulic system, electric control system, run out table, etc.
Production process
Manually uncoiling →Feeding & Correcting→ Seven rollers flattening device → Flat panel Punching→ Roll forming → Cutting after roll forming → Finished product.
Raw material |
Material spec | Colored steel sheet, galvanized steel sheet, aluminum sheet |
Thickness of coil sheet | 2.0-3.0mm |
Machine details |
Roller material | High grade no. 45 forged steel with 0.05mm hard chrome plating |
Shaft material | High grade no. 45 carbon wrought steel |
Cutting blade | Cr12 mould steel with quenched treatment |
Diameter of shaft | 90mm or as your requirement |
Main frame | 350 h steel |
Hydraulic pressure | 10-12mpa |
Controlling system | Famous plc computer control |
Material of cutting table | Cr 12 mould steel with quenched treatment |
Hydraulic oil | 40# hydraulic oil |
After sale-services |
Delivery time | 50workdays after receiving the deposit |
Payments | 30% deposit by t/t in advance and 70% balance after inspection confirmation before shipment |
5T hydraulic decoiler:
Steel coil width: from 1000 mm to 1250 mm;
Internal diameter of coil: variable, from 480 mm to 530 mm
Maximal out diameter:2000mm
Maximum coil weight: 5000 Kgs;
Coil placement in the coil holder: hydraulic hoist;
Pulling of steel from the coil to the pulling mechanism for the start: manual;
Suitable of the pulling mechanism for all required thicknesses: included;
Device preventing unwinding of the coil from the coil holder: included;
Uncoiled metal compensator: included, assures even feeding at all production speeds;
Oil cylinder dia:120mm
Working speed: 0-15m/min adjustable
Main motor power: 5.5KW AC motor
Hydraulic power: 4kw
Flattener:
The quantity of leveler rolls must be planned according to thickness 2.0mm to 3.0 mm.
Flattener roller: upper is 3 rollers, down is 4 stations(total is 7 rollers)
Flattener roller material: SAE 1045 thermal treatment hardness 48-52 HRC.
Diameter of flattener shaft:¢70mm, material is SAE 1045, hardening and tempering
Punching:
Adopt Hydraulic punching
Diameter of cylinder¢140mm
Working pressure: 20mpa
The punches and dollies will be CR-12, hardness HRC 58-62
Hydraulic power :11KW
Dimensions: 1.5m* 1.1m* 1.2m
Forming section:
Main motor power : 55 kw
Cycloidal pin wheel reducer : BWD14-43-55KW,
Place of Origin:Shanghai or Cangzhou
Transmission:Gear box 170#
Shaft diameter: ¢110 mm material: SAE1045 with quenching and tempering
Roller material:ASTM1045 chrome plated surface with chrome
Forming station: about 16 stations (according the final design)
Machine roll forming speed :0m-15m/min(without punching)
Machine Voltage, Frequency:Japan Yaskawa(380 V, 50 Hz, 3Phase)
Cutting :
Shearing by hydraulic station
Material of blade:Cr12, 58-62 HRC hardness
Diameter of cylinder¢200mm
Working pressure:30mpa
Working range :80mm
Out table:
Jointed by 60mm*40mm tube (adjustable)
One out table with two support roller
Size: 1.0m long*0.8mwide*0.6-1mhigh (adjustable)
Hydraulic station:
Hydraulic power: 18.5kW
Working pressure: 20-25Mpa adjustable
Solenoid valve: 3 group
Hydraulic oil: 46# hydraulic oil
Color: Blue (or base on customer request)
1. Does one machine can only produce one style panel profile?
Not exactly.For wider and double layer making machine. It can produce more than 6 kinds of panels.
2. Do you have after sales support?
Yes, we are happy to give advice and we also have skilled technicians available across the world.We needyour machines running in order to keep your business running.
3. How to visit your company?
A.Fly to Beijing airport: By high speed train From Beijing Nan to Cangzhou Xi (1 hour), then we can pick up you.
B.Fly to Shanghai Airport: By high speed train From Shanghai Hongqiao to Cangzhou Xi (4.5 hours), then we can pick up you.
4. What can you do if the machine broken?
Our machine's warranty period is 12months, if the broken parts can't repair, we can send the new parts replace the broken parts freell, but you need pay the express cost yourself.if after warranty period, we can through negotiationfor to solve the problems, and we supply the technical support for the whole life of the equipment.
5. Can you be responsible for transport?
Yes, please tell me the destination port or address.we have rich experience in transport.
Company photo :