China Large series horizontal HDD drilling rig machine GS6000-TS for crossing project to your first choose, Find details about China drilling machine, drilling rig machine from Large series horizontal HDD drilling rig machine GS6000-TS for crossing project to your first choose
Rig Weight | 52t | Dimension (L*W*H) | 20400*2500*3740mm |
Max Torque | 173000N·m | Max Push & Pull Force | 6700kN |
Max Rotation Speed | 90rpm | Max Push & Pull Speed | 40m/min |
Max Clamp Force | 1500kN | Max Unscrewing Force of Pipe Jaw | 420000N·m |
Engine Power | 3*410kW | Max Working Pressure | 35MPa |
Drill Pipe Diameter | Φ168mm-Φ194mm | Max Length of Drill Pipe | 9.6m |
Entry Angle | 8°-18° | Power Station Size(L*W*H) | 20400*2500*3740mm |
Main Spidle Floating Distance | 110 mm | Mud Pipe Channel Diameter | 101.6mm |
Max Mud Floating Volume | 3000L/min | Max Mud Pressure | 20MPa |
Permitted Environment Temperature | -20°C-45°C | Permitted Environment Humidity | >90% |
Max Aperture Diameter | ø2000mm (Soil Depended) | Max Crossing Length | 2500m (Soil Depended) |
1.Three sets Cummins engine can meet different working conditions and save energy.
2.German Rexroth high-pressure large-flow swash plate axial plunger pump and motor.
3.High pressure electric control open-circuit system is more energy-saving.
4.The open-circuit is composed of classic Sauer high-pressure load sensitive oil pump and proportional control multi-way valve.
5.Best quality filters with high filtration ability ensures the cleanness of system and extends maintenance interval.
6.The electrical system includes a series of independent design of safety control system and auxiliary control software.
7.Main rig, power station, and operation cabin are detached.
8.10 sets of push & pull motors are equipped with manually high-strength large-torque clutch.
9.Equipped with slurry pressure release device.
10.Independent operation cabin can accommodate a few people, spacious, wide-view, and equipped with air-conditioner.
11.Equipped with aisle and guardrail on the side and end of the beam for safety purpose.
12.Optional separated Mud pump station and mud mixing system.
13. Equipped with manipulator to enhance the efficiency of loading/unloading drill rods.
FAQ
1. What about the warranty time?
A:12 months after shipment or 2000 working hours, whichever occurs first.
2. What about the delivery time?
A:20 days after receiving the deposit.
3.What kind terms of payment can be accepted?
A: On T/T term, 30% down payment is required in advance, and 70% balance shall be before shipment, or against the copy of original BL for old client.
On L/C term, 100% irrevocable L/C without "soft clause" can be accepted.
4.What logistics ways we can work for shipment?
A: We can ship machine by sea and road.
5. What about the after-sales service?
A: We have office and professional after-sales service team in many countries. After you receiving the new machine, we will provide you one engineering training installation and debugging service for 3-5days. If there are some problems, our after-sales service team will arrive the project site in shortest time.
If you want to get more product information and the most reasonable market price,please contact me at any time.