This Producing Process Sketch As Below Picture:This Profile Drawing As Below Picture:
General Parameter
1 | Item | Parameters |
2 | Model NO. | YX18-136.7-1093.6 |
3 | Material | Pre-painted galvanized sheet |
4 | Thickness | 0.45-0.55 mm |
5 | Yield Strength | 245 MPa |
6 | Feed Width | 1250 mm |
7 | Effective width | 1093.6 mm |
8 | Roll Stages | 18 Stages |
9 | Shafts Diameter | ∅75/95 mm |
10 | Main Motor Power | 11 KW |
11 | Hydraulic Group Power | 5.5KW |
12 | Max. Line speed of roll former | Approx. 15 m/min |
13 | Electric Standard | According to local voltage |
Machine Components
A. 5 Ton X 1250 Hydraulic Un-coiler-provided by the buyer themselves
B. Entry roller & Manual Pre-shearing device Dual Leveling Un-powered
Smart cut control, to cut off the end of the final piece of sheet only
Working thickness up to 0.8mm
C. Dual Cold Rolling Mills
Gear/Sprocket driving; Dual Levelling
Upper Level for YX40-193-965 profile, 22-step to form
Down Level for YX18-136.7-1093.6 profile, 18-step to form
Rollers manufactured from 45# steel, CNC lathes, hard Chrome Coated
Shafts Diameter=ф75/95mm, Precision Machined, fine Polished
Main motor =11 K5.5W, Frequency speed control
The two levels can't be run at the same time
Manual Clutch to switch the driven system
Max. Line speed of roll former: Approx. 15m/min
Protection Mesh Cover (full mesh type) Above Roll-former To Avoid Hands Go Inside
D. Hydraulic Cutting Device
Stop to cut, Post cut, No blanking cut
Two pairs of cutting tools, one for YX40-193-965 Profile, another for YX18-136.7-1093.6 Profile
Cutting tool material: Cr12, Heat treatment
Hydraulic group, Pump motor =5.5KW
E. PLC Control System
Control the quantity & cutting length automatically.
Control the switch action to run the different two profiles
Combined with: PLC, Touch Screen (Siemens), Inverter (Schneider),
Encoder (Omron), etc
Cut-to-length tolerance≤±2 mm
Control voltage 24V
F. Product Rack Un-powered, 3 units
After-Sale Service
In correct operation & maintaining, the machine is guaranteed for one year since leaving our factory excludes the electric elements.
Installation:
If installation is needed, WE will dispatch a technician to the buyer's factory abroad to assist regulating the machine with charge free. The buyer should assist US to get the Chinese technician's visa and should pay for the roundtrip air ticket and the local accommodation.
If installation is needed, the buyer shall make the following preparation before arrival of technicians.
Terms Of Trade
1.Package & Shipment: Facility water-proof packing, Control cabinet packed in wooden packing.
2.Payment: 30%payment by T/T is required as deposit within a week since the contract signing date.70% payment by T/T is required before the machine be send out of factory.