No. | Index content | unit | Index value |
I | Name | AAC block& panel | |
Production scale(annual capacity) | m³ | 200,000 | |
Specification(cake: 4.8×1.2×0.6) | m | China national standard(GB) | |
II | Working system(three-shift continuous weekly production) | 300 days / year 22.5 hours / day 7.5 hours / shift | |
III | Main raw material consumption | ||
1. sand | Ton / year | 86600 | |
2.lime | Ton / year | 21100 | |
3. gypsum | Ton / year | 3800 | |
4. cement | Ton / year | 12400 | |
5. Rebar steel | Ton / year | 2500 | |
IV | Total capacity (without ball mill power) | KW | ≈1000 |
V | Annual power consumption | 10,000KW.h | ≈400 |
VI | Annual water consumption | Ton | ≈76400 |
VII | Annual gas consumption | Ton | ≈30000 |
VIII | Single-shift producing operators | people | 7 |
Single-shift auxiliary personnel (including forklift and boiler gas distribution ) | 21 | ||
IX | Total plant construction area | hectare | ≈45 |
Construction area | m2 | ≈9000 | |
Storage covering | m2 | ≈10000 |
No. | Index content | unit | Index value |
I | Name | AAC block & panel | |
Production scale(annual capacity) | m³ | 400,000 | |
Specification(cake: 6.0×1.2×0.6) | m | China national standard(GB) | |
II | Working system(three-shift continuous weekly production) | 300 days / year 22.5 hours / day 7.5 hours / shift | |
III | Main raw material consumption | ||
1. sand | Ton / year | 129900 | |
2.lime | Ton / year | 31600 | |
3. gypsum | Ton / year | 5600 | |
4. cement | Ton / year | 18600 | |
5. Rebar steel | Ton / year | 5000 | |
IV | Total capacity (without ball mill power) | KW | ≈1250 |
V | Annual power consumption | 10,000KW.h | ≈550 |
VI | Annual water consumption | Ton | ≈113500 |
VII | Annual gas consumption | Ton | ≈45000 |
VIII | Single-shift producing operators | people | 7 |
Single-shift auxiliary personnel (including forklift and boiler gas distribution ) | 21 | ||
IX | Total plant construction area | hectare | ≈60 |
Construction area | m2 | ≈12000 | |
Storage covering | m2 | ≈20000 |