China 2.5rt Electric Control Cabinet Cooling Chiller, Find details about China Industrial Chiller, Cutting Solution Cooling Chiller from 2.5rt Electric Control Cabinet Cooling Chiller
Technical Parameters
Model No. | RHP -1/2A | RHP -001A | RHP -002A | RHP -003A | RHP -004A | RHP -005A | RHP -006A | |
Refrigeration Capacity | 50HZ- KW | 1.53 | 2.94 | 5.67 | 8.39 | 10.9 | 13.95 | 16.9 |
50HZ- Kcal/h | 1316 | 2528 | 4872 | 7216 | 9374 | 11990 | 14530 | |
60HZ- KW | 1.79 | 3.44 | 6.63 | 9.82 | 12.75 | 16.32 | 19.77 | |
60HZ- Kcal/h | 1540 | 2958 | 5701 | 8442 | 10968 | 14028 | 17000 | |
Power Supply | 1N - 220V - 50HZ/60HZ | 3N - 380V/415V - 50HZ/60HZ | ||||||
Refrigerant | Type | Standard R-22 / Eco-friendly type R134a or R407c | ||||||
Control | Capillary | |||||||
Vol (kg) | 0.6 | 0.8 | 1.8 | 2.7 | 3.5 | 4.3 | 5 | |
Compressor | Type | Scroll Type | Piston Type | |||||
Qty | 1 | |||||||
Input(kw) | 0.55 | 0.75 | 1.5 | 2.25 | 3 | 3.75 | 4.5 | |
Cooling Flow Rate | m3/h | 800 | 1000 | 2000 | 3000 | 4000 | 5000 | 6000 |
Freezing Water Flow | 50HZ- m3/h | 0.26 | 0.51 | 0.97 | 1.44 | 1.87 | 2.4 | 2.91 |
60HZ-m3/h | 0.31 | 0.59 | 1.14 | 1.68 | 2.19 | 2.81 | 3.41 | |
Tank (m3) | 0.022 | 0.028 | 0.038 | 0.038 | 0.065 | 0.065 | 0.11 | |
Pipe Dia. | G 1/2" | G 1/2" | G 3/4" | G 3/4" | G 3/4" | G 1" | G 1" | |
Buit-in Water Pump | Power (kw) | 0.2 | 0.2 | 0.55 | 0.55 | 0.55 | 0.55 | 0.55 |
Lift (Kpa) | 180 | 180 | 210 | 200 | 200 | 200 | 200 | |
Size | L(mm) | 600 | 600 | 820 | 945 | 945 | 1035 | 1035 |
W(mm) | 400 | 400 | 460 | 565 | 565 | 610 | 610 | |
H(mm) | 940 | 940 | 1155 | 1365 | 1365 | 1365 | 1365 | |
Weight | KG | 45 | 60 | 120 | 130 | 160 | 170 | 250 |
Work Principle
Applications
Be widely used in plastics, electroplating, electronics manufacturing, pharmaceutical chemicals, food processing, refrigeration and other industrial establishments and guesthouses, hotels, shopping malls, office buildings and other types of civil air-conditioning system.
Package & Shipping
Use standard export plywood case with forklift truck feet, easy to load and unload
5-7 days to finish the production after receiving the deposit
Shipping by LCL or FCL
After-sales service