Portal Frame Warehouse Construction Workshop Pre Engineering Steel Structure Building

China Portal Frame Warehouse Construction Workshop Pre Engineering Steel Structure Building, Find details about China Steel Building, Steel Structure from Portal Frame Warehouse Construction Workshop Pre Engineering Steel Structure Building

Model NO.
XTW-KA1028
Surface Treatment
4-Layer of Painting
Window
Aluminum Alloy Window or Plastic Steel Window
Roof Maintenance
Color Plate
Purlin
C or Z Section Steel
Wall Maintenance
Color Plate
Tie Bar
Round Pipe
Partition
Sandwich Panel
Ventilation
Roof Ventilator
Door
Lifting Door
Frame
Portal Frame
Application
Warehouse, Workshop, Office
Color
Customized
Canopy
Color Plate
Trademark
XTW
Transport Package
Common Package
Specification
Q355B, Q235B
Origin
Qingdao, China
HS Code
9406900090
Model NO.
XTW-KA1028
Surface Treatment
4-Layer of Painting
Window
Aluminum Alloy Window or Plastic Steel Window
Roof Maintenance
Color Plate
Purlin
C or Z Section Steel
Wall Maintenance
Color Plate
Tie Bar
Round Pipe
Partition
Sandwich Panel
Ventilation
Roof Ventilator
Door
Lifting Door
Frame
Portal Frame
Application
Warehouse, Workshop, Office
Color
Customized
Canopy
Color Plate
Trademark
XTW
Transport Package
Common Package
Specification
Q355B, Q235B
Origin
Qingdao, China
HS Code
9406900090
Portal Frame Warehouse Construction Workshop Pre Engineering Steel Structure Building


PRODUCT DESCRIPTION

1. Flexible layout
2. Good ductility, strong plasticity and deformation, strong earthquake resistance and wind resistance performance
3. High construction effcience and long service life
4. Light weight, high quality with low cost
5. Environmental protection : materials can be 100% recycled or degraded


Portal Frame Warehouse Construction Workshop Pre Engineering Steel Structure Building

PROJECT MATERIAL LIST
Main Parts
Item Name
Specification
Main Steel Frame
Steel Column
Q235B Hot-rolled H Steel or Q345B Welded H Steel
Steel Beam
Q235B Hot-rolled H Steel or Q345B Welded H Steel
Bracing
Q235B Tie Bar, Steel Pipe, Angle Steel
Roof & Wall Purlin
Z or C Section Steel
Cladding Material
Roof and Wall Panel
Steel Color Plate or Sandwich Panel with EPS, Fiberglass Wool, Rock Wool or PU
Accessories
Bolts
Anchor Bolts, Ordinary Bolts,Expension Bolts, High Strength Bolts etc
Gutter
Stainless Steel Plate or Steel Color Plate
Window
Aluminum Alloy Window, Plastic Steel Window, Window-Shades
Door
Sandwich Panel Sliding Door, Rolling Door, Lifting Door,Side Hung Door
Downpipe
PVC
Ventilator
Stainless Steel or Steel Color Plate
Portal Frame Warehouse Construction Workshop Pre Engineering Steel Structure Building

FINISHED PROJECT

Portal Frame Warehouse Construction Workshop Pre Engineering Steel Structure Building
Portal Frame Warehouse Construction Workshop Pre Engineering Steel Structure Building
Portal Frame Warehouse Construction Workshop Pre Engineering Steel Structure Building
Portal Frame Warehouse Construction Workshop Pre Engineering Steel Structure Building









DELIVERY & PAYMENT
Delivery: 20-45 days after the deposit received
Payment: T/T 30% as deposit, and the 70% balanced before loading the containers
Portal Frame Warehouse Construction Workshop Pre Engineering Steel Structure Building

 

I can give you a quoted price if you offer this

1. Dimension: Length, width, height etc.

2. Doors and windows: Dimension, quantity, position.

3. The material on the roof and the wall.

4. Local climate: Wind speed, snow load, seismic magnitude etc.

5. If you have other requirements, please also inform us.

6. It's better if you have your own drawings .Please send them to me.

ABOUT US

Portal Frame Warehouse Construction Workshop Pre Engineering Steel Structure Building
 

Portal Frame Warehouse Construction Workshop Pre Engineering Steel Structure Building
Portal Frame Warehouse Construction Workshop Pre Engineering Steel Structure Building

FAQ

1.How about the cost of prefabricated building?

Compared with concrete buildings, assembly buildings are lighter in quality and more economical. Factory production to reduce the labor intensity and time of the installation workers at the construction site.

2.How long is the service life of the portal H-type steel frame?

The service life of the main steel frame can last for 50years.

3.Is the steel frame safe and stable?

Yes, here is the statistics: Earthquake resistance: Grade 8 or more, Wind resistance: Grade 12(wind speed≤ 120km/h)

4.What is the advantages of the steel frame compared to the traditional building?

The main advantages are light, economy, and the workers' labor intensity is low. It can be assembled quickly.   

5.How can I assemble the portal H-type steel frame?

All the steel components will be bolted, no soldering, all the walls and roof structures, the floor will be fixed with self tapping screws or nails, and the general team of locksmiths can do well. If you need, we can arrange our technicians to guide the installation on site, or our construction team to install it for you.