Mining Use Apron Vibrating Feeder Machine for Mineral Processing

China Mining Use Apron Vibrating Feeder Machine for Mineral Processing, Find details about China Rock Feeder, Mining Feeder from Mining Use Apron Vibrating Feeder Machine for Mineral Processing

Model NO.
GZ-3
Motor Power(kw)
2.2 Kw
Installation Slope
5
Chute size(mm)
Many Types
Overall Dimension
Many Types
Width and Lenth
Can Make as Your Require
Trademark
Hengchang
Transport Package
Export Container, Wooden Case
Specification
60*80
Origin
Jiangxi Province, in China
HS Code
8474100000
Model NO.
GZ-3
Motor Power(kw)
2.2 Kw
Installation Slope
5
Chute size(mm)
Many Types
Overall Dimension
Many Types
Width and Lenth
Can Make as Your Require
Trademark
Hengchang
Transport Package
Export Container, Wooden Case
Specification
60*80
Origin
Jiangxi Province, in China
HS Code
8474100000
Mining Use Apron Vibrating Feeder Machine for Mineral Processing
                             

1.Product Application
Apron feeder is widely used in building material, metallurgy, electric power, coal, chemical industry, foundry industry, etc. Especially suitable for the conveying of high temperature, large blocks, with sharp edges and wear resistance strong solid material In the cement industry, the best choice for shaft kiln clinker conveying. 
SPECIFICATIONS FOR APRON FEEDER
Plate width(mm)500-800
Length(mm)2000-18000
Speed (m/s)(M/S)7-308
Granular size(mm)0.05-0.4
Capacity(t/h)180-350
Power(kw)1.1-5.5
Reference weight(kg)2500-11000   
 Mining Use Apron Vibrating Feeder Machine for Mineral Processing
Mining Use Apron Vibrating Feeder Machine for Mineral Processing

2.Main Features 
1) High efficiency. 
2) Long service life. 
3) Including the feed trough, to prevent the material leakage. 
4) Thickness of plate from 8mm to 20mm, impact resistance and long time. 
5) Variable speed by frequency conversion control cabinet, 0.01-0.15 m/s.  
Pre-Sales Service 
* Inquiry and consulting support. 
* View our Factory.  
After-Sales Service 
* Training how to install the machine, training how to use the machine. 
* Engineers available to service machinery overseas.  
Mining Use Apron Vibrating Feeder Machine for Mineral Processing

 
3.Specification:
 
ModelMax. feeding size (mm)Processing
 capacity (t/h)
Motor power (kw)Obliquity of material trough (°)Total weight (kg)Trough size (mm)Dimensions (L×W×H) 9mm)
GZD-650×2300300801.1×2102798650×23002300×1360×780
GZD-750×25003501001.1×2103260750×25002500×1460×780
GZD-850×30004001203×2103607850×30003110×1800×1600
GZD-1000×36005001505.5×21038951000×36003850×1950×1630
GZD-1100×42005802405.5×21041701100×42004400×2050×1660
GZD-1300×49006504507.5×21052001300×49005200×2350×1750
GZD-1500×56001050450-80011×21075001500×56005700×2000×1750
ZSW-380×95500100-16011048233800×9603920×1640×1320
ZSW-490×110630150-32015066474900×11004980×1830×1320
ZSW-490×130750400-60022087604900×13004980×2580×2083
ZSW-600×130750400-60022092506000×13006082×2580×2083
ZSW-600×150800500-700300101906000×15006086×2662×1912
ZSW-600×180800700-1000370137506000×18006310×3262×2230
 
4,Installation
Trough feeder can be installed on the ground, can also be onto discharge port of ore bin. The groove base plate to do reciprocating movement, its speed is 20-60 / min, 20-200mm stroke. Stroke can be composed of a driving device of eccentric wheel and make appropriate adjustments, eccentricity half for stroke. According to production practice, the viscous ore, eccentricity should not be less than 30mm.The chute feeder groove width of about feeding maximum size 2-2.5 times. The largest chute feeder, can meet the needs of less than 500mm particle size of iron ore to the mine. The most commonly chosen specification is 980 * 1240 trough feeder, the feeding size is 350-0mm, suitable for 400 * 600 jaw crusher feeding equipment.
 
5,Preparation before operation and inspection
1)Check the Department of the gas (grease) points are short of oil.
2)The gear box lubricating oil is oil marking.
3)The fastening bolts are loose.
4)Skateboards and roller is moving on.
5)The pins are loosen or not.
6)A triangle belt is the phenomenon of damage.
7)Whether there is leakage groove grinding or other damage.
8)The safety device such as a belt cover is firmly.
9)The current table pointer is in the zero position.10, each switch, button is intact
10)Each switch, button is intact.
 
6,Method of operation
1)Starting method of operation
A,Before the operation must be itemized inspection before driving examination content.
B,Make good preparations for driving signal at.
C,Switch, starter button operation.
2)Shutdown method
A,Ore bin ore must be to finish, then stop
B,According to the feeder operation stop button.
C,Off the power switch.
D,Without notice blackout and emergency shutdown shall immediately pull switch.

7. About US
Jiangxi Hengchang Mining Machinery Manufacturing Co., Ltd. is located in No.3 Chuangye Road. Guzhang In dustrial Park. Shicheng County. Ganzhou City. Jiangxi Province. China.Our company is engaged in the mineral processing equipment research, development, design and production for many years history, has accumulated rich experience in design and production. Enterprise in mineral processing equipment industry has had a positive effect, set up the good reputation. And mainly the manufacture of the products like as Shaking table. Flotation equipment. Crushing equipment. Magnetic separator. Screening equipment. Classifying equipment. Agitation tank, Feeding equipment. Gravity separation equipment. Wet separation equipment. Spiral chute. Saw-tooth wave jig and Diaphragm Jig. Grinding equipment. Ball mill. Slurry pump. Centrifugal pump, Conveying equipment.

We manufacture various types of mineral processing machinery and equipment according to our customers' requirements. Our products are widely used for sorting gold, silver, copper, iron, tungsten,lead. zinc. tin. molybdenum, nickel, tantalum, niobium, manganese ore, coal, monazite, rutile,diamonds, other precious metals and precious metals mine, and for the flotation colored, black metal,precious metals and other minerals. And we have export qualifications, our products sell well all over the world for several years, especially exported to Brazil. India. Indonesia.South Africa. Somalia, Philippines. Malaysia. Sudan, Nigeria. Iran, Russia, Ghana. Kazakhstan Kyrgyzstan.Cambodia,Vietnam,Korea,Mongolia and other countries.

Mining Use Apron Vibrating Feeder Machine for Mineral Processing

Mining Use Apron Vibrating Feeder Machine for Mineral Processing
Mining Use Apron Vibrating Feeder Machine for Mineral Processing

8.Our service:
 1.Pre-sale services:
  (1)Select equipment model;
  (2) Design and manufactLire products according to clients' special requirement;
  (3)Train technical personnel for dients.

2.Services during the sale:
(1) Pre-check and accept products ahead of delivery;
(2)help clients to draft solving plans.

3. After-sale services:
(1) Assist dients to prepare for the first construction scheme;
(2)Install and debug the equipment;
(3) Train the first-line operators on site;


9. FAQ
1. How long has Hengchang been in business?

Our business has been in operation since 1995. For over 20 years we have served the mining industry offering gold
/coltan/tin/tungsten mining equipment

2. How long is the warranty period ?

The warranty for the main machine is 12 month. we also supply spare parts to customer.

3. What is the Salary of engineer ?
100 USD Per day, the air ticket, accommodation, should be beared by customer.

4. Where is Hengchang factory located ?
how about the transportation ? The factory is located in Ganzhou city. The Airport is
Huangjin Airport, which can directly flight to Guangzhou, Shanghai, Shenzhen, Beijing.

5. What is the leading time ?
For shaking table and laboratory mining equipment ,we can send out within 10 days;
For large mining equipment and customized machine, the lead time is 30-40 days.

6. What is the nearest Sea port ?
Xiamen Port, Guangzhou Port, Shenzhen Port

7. What is the trade terms ?
CIF,FOB ect is acceptable.

8. What normal mining procedures including?

A. Sampling and analysis of the sample. take enough sample from different location and depth, analysis the size distribution and
element.

B. Engineer and geologist site survey. based on the analysis report at stage one, the geologist will determine the reserve and
mining area. the engineer will consider the plant location and process flow.

C. Separation test. take samples to do separation test based on the process flow on stage Two.

D. Based on the result of testing, adjust the process flow if necessary.

E. Determine the capacity of the plant based on the quotation of plant and estimated output.

F. Place order and equipment production.

G. Plant design. ground clearance and basement building according to the design.

H. Plant installation and testing production.

I. Training and debugging.