Truck Spare Parts Concrete Pump Delivery Cylinder 1. Product Description:Putzmeister Concrete Pump Delivery Cylinder
Concrete pump truck spare parts pipe elbow
Product Parameter:
Chemical Components | Specifications Name | C | S | P | Si | Mn | Cr | Ni | Mo | Cu | HRC | Special High Chrome | 2.8-3.1 | <0.5 | <0.5 | 0.9 | 0.9 | 26 | <1 | <1 | <0.4 | >58 | High Chrome | 2.8-3.1 | <0.5 | <0.5 | 0.9 | 0.9 | 16 | | | | >55 | Low Chrome | 2.8-3.1 | <0.5 | <0.5 | 0.9 | 0.9 | 6 | | <0.5 | | >48 | High Managenese Steel | 1.2 | <0.5 | <0.5 | | | | | | | | Alloy Steel Casting | 1.2 | <0.5 | <0.5 | | | | | | | |
Product specification | Categories | Twin cast elbow | Model | 125XR275-90 | Suit brand | XCMG | Application | Concrete pump truck | Material | KmTBCr15-26 | Hardness | >=62 | Useful life | 60,000 CANS | Standard | CN: KmTBCr15-26 US: ASTM A532 Class 2 Type D | Shock impact value | >3 ak N.M/CM2 | Certification | ISO 9001 2015 |
Product Show:
Product Advantage:SN. | Item | Advantages | 1 | Service life | The pumping volume is 50,000 - 100,000 m3 for complete pipeline, increased by 50% to 200% compared with the same industry; | 2 | Product price | The price of complete pipeline is reduced by 30%-50% compared with the same industry; | 3 | Cost performance | The cost performance of complete pipeline is increased by 2-4 times compared with the same industry; | 4 | Product weight | The single-piece weight is reduced by 15%, and the weight of complete product is reduced by more than 150 Kg. | 5 | Product stability | The intelligent production and the assembly line operation are adopted to achieve a qood product consistency and a rate of "three guarantees" offess than 0.01%. | 6 | Delivery period | The delivery period of complete pipeline is 5 - 7 days. |
Company Information: Hunan Teila Heavy Industry Machinery Service Co., Ltd is an importing and exporting company, it was originated in Heny group which was founded in 2010 Changsha city Hunan province. Teila focuses on the development of construction machinery in post-market. After years of growth, Teila has developed 6 divisions which included heavy machinery, used machinery, re-manufactured machinery, pump truck accessories business, pump leasing, training service and a platform named Chinese Used Concrete Pump Alliance. Today, it is number one for re-manufacturing concrete pump machinery/Truck Mounted Concrete Pump/Truck Mixer/Trailer Pump/Concrete Batching Plant/others heavy duty machine and genuine accessories in China. Our plants covering an area of 40000 square meters, there are 1500 staffs in our group and annual sales volume exceed 0.1 billion USD. Our business network covers the whole mainland and has exported to Asia, Europe, and America such as Vietnam, Indonesia Cambodia, Singapore, Pakistan, Egypt, and other countries.
Exhibition:
Related Products:
| |
2. Detailed Show:
3. Specifications:1. Chrome thickness: 0.2mm-0.3mm
2. Chrome layer hardness:> HV900
3. Bore surface roughness: Bore straightness error: <0.02mm
4. Bore cylinder error: <0.02mm / support
5. Cylinder diameter: φ140mm ~ φ360mm
7. Length: according to customer's request
8. Pledge: high quality products and excellent maintenance
9. Capacity: 50,000-80,000 cbm
10. Application: concrete pump with brand Putzmeister, Schwing, TEILA, Zoomlion, Kyokuto, Cifa, IHI.
4. Related Products:
5. Packing and Delivery:
6. Our Company HuNan Teila Heavy-machinery service Co., Ltd.We are professional manufacturer of concrete pump spare parts for Putzmeister, Cifa, TEILA, Zoomlion, Kyokuto, Niigata and so on concrete pump.
Concrete Pump Single wall and Twin wall Pipe/ Reducer Pipe
Concrete Pump Cast Elbow
Concrete Pump Clamp/ Coupling
Concrete Pump Rubber Hose
Concrete Pump Wear Plate and Cutting Ring
Concrete Pump S Valve/ Shut off Valve
Concrete Pump Piston
Concrete Pump Cleaning Ball and Cleaning Piston
7. FAQQ1: if you need send by LCL, then package by wooden case, if you need send by FCL, then send by container
Q2. What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages
before you pay the balance.
Q3. How about your delivery time?
A: less than 200 buckets need 3days after received your payment, if large quantity, then need 7-10days
Q4. What is your sample policy?
A: We can supply the sample if we have ready parts in stock, but the customers have to pay the sample cost and the courier cost.